Neighborhood IntelOpen on the map

RERA project · Mixed Development

Z-HUB BY SUMADHURA

by SUMADHURA MTB DEVELOPERS LLP · 318 homes · 1.40 acres · 2 towers · Bengaluru East

Delivered on time Completed: the builder filed for completion on 16 Feb 2026, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 16 Feb 2026, by the date it promised.

How much is sold?76 left
76% booked

242 of 318 homes, as the builder reported for Q3 2025-26.

How crowded is it?More crowded
227 homes per acre

Similar projects within 3 km: 81 per acre. 61% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?12 due so far
17% on time

Of its 27 RERA projects in Bengaluru Urban: 2 delivered on time, 10 late (after the date first promised), 15 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started20 Sep 2023
  2. Approved by RERA15 Dec 2023
  3. Completion filed16 Feb 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-26100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q3 2025-26

Block-A100%
Block-B100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

242 booked76 leftQ3 2025-26

Still available: 2 × COUPLE ROOM, 35 × ROOM, 17 × SHOP, 22 × OFFICE.

Booked, by type

COUPLE ROOM12 of 14
ROOM196 of 231
SHOP14 of 31
STUDIO ROOM14 of 14
OFFICE6 of 28

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

ROOM
151 sq ft
14 m² carpet
8 m² land share · 4 m² balcony/terrace · 1 parking space
231 homes · 73% of the project
SHOP
391 sq ft
36 m² carpet · sizes 230–2,000 sq ft (8 at this size)
29 m² land share · 4 m² balcony/terrace · 1 parking space
31 homes · 10% of the project
OFFICE
245 sq ft
23 m² carpet · sizes 245–2,512 sq ft (4 at this size)
86 m² land share · 9 m² balcony/terrace · 3 parking spaces
28 homes · 9% of the project
COUPLE ROOM
217 sq ft
20 m² carpet
11 m² land share · 3 m² balcony/terrace
14 homes · 4% of the project
STUDIO ROOM
293 sq ft
27 m² carpet
14 m² land share · 3 m² balcony/terrace
14 homes · 4% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block-A7 floors
Block-B5 floors

Block-A: 269 homes, 24 m tall, 1 basement · Block-B: 49 homes, 24 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project227
Typical within 3 km (12)81
Typical in the city (114)79

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project61%
Typical within 3 km (12)72%
Typical in the city (118)63%

The share of the land not built on, which includes roads.

Land
1.40 acres

5,666 m²

Ground covered by buildings
39% of the land

2,190 m²

Floor-area ratio
2.50

Floors built per unit of land: 2.50 m² of floors for each m² of land.

Parking
0.41 per home

131 covered, 0 open

Built-up area, all floors
2,13,244 sq ft

19,811 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active mixed development projects with a land area on RERA; the comparison is ours.

Who is building it?

All 27 RERA projects of Sumadhura on the map

The company

Registered as
SUMADHURA MTB DEVELOPERS LLP
Type
Partnership Firm
Company number
AAM-4375

CIN or LLPIN, from the Registrar of Companies.

PAN
ADQFS9879J
GSTIN
29ADQFS9879J1ZO
Website
[email protected]

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹34.5 crBuilding and development ₹73.0 crTotal ₹107.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹11.8 cr₹8.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.56 kmReliable
  • Nearest railway station3.29 kmReliable
  • Bus stops within 500 m9Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km11Caveat
  • Nearest lake / water body (≥2 ha)0.75 kmCaveat

Hospitals

  • Nearest hospital0.37 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionWhitefield PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.73 kmReliable
  • Nearest sewage treatment plant0.57 kmCaveat
  • Industrial zones within 1 km9Caveat
  • Nearest airfield runway (any, incl. military)6.48 kmCaveat
  • Nearest commercial-airport runway22.62 kmReliable
  • Distance to runway approach-path proxy21.82 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.98487, 77.73345), 2026-10-24. Each figure's source and caveat are in the full report.