Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Vruksha Greens

by Vruksha Infra · 80 homes · 0.82 acres · 1 tower · Bengaluru North

Upcoming Under construction, due Jun 2027, after an extension. 60% built with 84% of the time used. 30% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
60% built

Due 30 Jun 2027. 84% of the time from RERA approval to the deadline has passed.

Built60%
Time used84%
How much is sold?56 left
30% booked

24 of 80 homes, as the builder reported for Q4 2025-26.

How crowded is it?About the same
97 homes per acre

Similar projects within 3 km: 96 per acre. 53% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Apr 2023
  2. Approved by RERA9 May 2023
  3. First promised30 Jun 2026

    The date the builder gave at registration.

  4. Today24 Oct 2026

    84% of the time to the deadline has passed.

  5. If it slips like a typical project31 Mar 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2654%
Q4 2025-2660%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

24 booked56 leftQ4 2025-26

Still available: 26 × 2 BHK, 30 × 3 BHK.

Booked, by type

2 BHK14 of 40
3 BHK10 of 40

Booked, each quarter

Q3 2025-2619 of 80
Q4 2025-2624 of 80

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
858 sq ft
80 m² carpet · sizes 825–859 sq ft (28 at this size)
44 m² land share · 17 m² balcony/terrace · 1 parking space
40 homes · 50% of the project
2 BHK
764 sq ft
71 m² carpet · sizes 732–767 sq ft (26 at this size)
39 m² land share · 16 m² balcony/terrace · 1 parking space
40 homes · 50% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Vruksha Greens4 floors

Vruksha Greens: 80 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project97
Typical within 3 km (20)96
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project53%
Typical within 3 km (19)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.82 acres

3,329 m²

Ground covered by buildings
47% of the land

1,551 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
2.20 per home

88 covered, 0 open

Built-up area, all floors
1,14,291 sq ft

10,618 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
Vruksha Infra
Type
Partnership Firm
PAN
AASFV2089A

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹12.4 crBuilding and development ₹25.2 crTotal ₹37.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹2.3 cr₹2.3 cr
Q4 2025-26₹4.2 cr₹4.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.16 kmReliable
  • Nearest railway station1.39 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)0.9 kmCaveat

Hospitals

  • Nearest hospital0.65 kmCaveat

Schools

  • Schools in pincode 560073 (UDISE+ census)99Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km22Caveat
  • Median pupil-teacher ratio, schools within 1 km19.2 :1Caveat
  • Schools with library + playground + ICT lab (1 km)12Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBagalgunte PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km3Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km8Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.02 kmReliable
  • Nearest sewage treatment plant2.14 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)9.22 kmCaveat
  • Nearest commercial-airport runway23.81 kmReliable
  • Distance to runway approach-path proxy16.84 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.06371, 77.51195), 2026-10-24. Each figure's source and caveat are in the full report.