by Vista Merez · 20 homes · 0.39 acres · 1 tower · Bengaluru South

Delivered late Completed: the builder filed for completion on 27 Jul 2020, 362 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 27 Jul 2020, 362 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
52 homes per acre

Similar projects within 3 km: 52 per acre. 52% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?2 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised).

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started22 Feb 2016
  2. Approved by RERA8 Dec 2017
  3. First promised31 Jul 2019

    The date the builder gave at registration.

  4. Completion filed27 Jul 2020

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3BHK
1,912 sq ft
178 m² carpet · sizes 1,688–1,930 sq ft (4 at this size)
79 m² land share · 1 parking space
20 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Vista Tribute4 floors

Vista Tribute: 20 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project52
Typical within 3 km (25)52
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project52%
Typical within 3 km (26)50%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.39 acres

1,560 m²

Ground covered by buildings
48% of the land

745 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Vista Merez on the map

The company

Registered as
Vista Merez
Type
Partnership Firm
PAN
AANFV6696C

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹4.0 cr
Construction
₹8.5 cr
Total project cost
₹14.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.15 kmReliable
  • Nearest railway station2.95 kmReliable
  • Bus stops within 500 m6Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km14Caveat
  • Parks within 1 km10Caveat
  • Nearest lake / water body (≥2 ha)2.72 kmCaveat

Hospitals

  • Nearest hospital0.2 kmCaveat

Schools

  • Schools in pincode 560025 (UDISE+ census)30Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km18Caveat
  • Median pupil-teacher ratio, schools within 1 km18.7 :1Caveat
  • Schools with library + playground + ICT lab (1 km)11Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAshokanagara PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)33 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well30.3 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km6Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.47 kmReliable
  • Nearest sewage treatment plant1.06 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)6.16 kmCaveat
  • Nearest commercial-airport runway26.45 kmReliable
  • Distance to runway approach-path proxy23.23 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.96715, 77.60048), 2026-10-24. Each figure's source and caveat are in the full report.