Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Vista

by M S Shelters Private Limited · 22 homes · 0.21 acres · 1 tower · Anekal

Upcoming Under construction, due Dec 2026. 79% built with 92% of the time used. 100% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
79% built

Due 31 Dec 2026. 92% of the time from RERA approval to the deadline has passed.

Built79%
Time used92%
How much is sold?0 left
100% booked

22 of 22 homes, as the builder reported for Q4 2025-26.

How crowded is it?More crowded
104 homes per acre

Similar projects within 3 km: 74 per acre. 37% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 1 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jan 2023
  2. Approved by RERA30 Jul 2024
  3. Today24 Oct 2026

    92% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2678%
Q4 2025-2679%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

22 booked0 leftQ4 2025-26

Booked, by type

3 BHK22 of 22

Booked, each quarter

Q3 2025-2622 of 22
Q4 2025-2622 of 22

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,049 sq ft
98 m² carpet · sizes 716–1,119 sq ft (5 at this size)
38 m² land share · 19 m² balcony/terrace · 1 parking space
22 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A4 floors

A: 22 homes, 11 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project104
Typical within 3 km (61)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project37%
Typical within 3 km (61)65%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.21 acres

855 m²

Ground covered by buildings
63% of the land

535 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.05 per home

18 covered, 5 open

Built-up area, all floors
25,091 sq ft

2,331 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of M S Shelters Private Limited on the map

Complaints to RERA about its other projects

The company

Registered as
M S Shelters Private Limited
Type
Company
Company number
U70102KA2007PTC043190

CIN or LLPIN, from the Registrar of Companies.

PAN
AAHCM0833F
GSTIN
29AAHCM0833F1ZK
Website
www.msshelters.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹2.6 crBuilding and development ₹9.9 crTotal ₹12.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹1.8 cr₹5.2 cr
Q4 2025-26₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.28 kmReliable
  • Nearest railway station4.82 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.1 kmCaveat

Hospitals

  • Nearest hospital3.06 kmCaveat

Schools

  • Schools in pincode 560099 (UDISE+ census)88Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.01 kmReliable
  • Nearest sewage treatment plant0.88 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)9.61 kmCaveat
  • Nearest commercial-airport runway35.87 kmReliable
  • Distance to runway approach-path proxy35.19 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.86520, 77.69460), 2026-10-24. Each figure's source and caveat are in the full report.