RERA project · Residential/Group Housing

VENTARA RESIDENCES

by AMBERSTONE PROPERTIES · 456 homes · 8.20 acres · 4 towers · Anekal

Upcoming Under construction, due Nov 2030. 45% built with 31% of the time used. 59% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
45% built

Due 30 Nov 2030. 31% of the time from RERA approval to the deadline has passed.

Built45%
Time used31%
How much is sold?185 left
59% booked

271 of 456 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
56 homes per acre

Similar projects within 3 km: 71 per acre. 76% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started30 Nov 2024
  2. Approved by RERA5 Dec 2024
  3. Today24 Oct 2026

    31% of the time to the deadline has passed.

  4. If it slips like a typical project1 Sep 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2624%
Q4 2025-2632%
Q1 2026-2738%
Q2 2026-2745%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A20%
Tower B20%
Tower C50%
Tower D45%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

271 booked185 leftQ2 2026-27

Still available: 114 × 3.5 BHK, 34 × 4 BHK, 37 × 3 BHK.

Booked, by type

3.5 BHK56 of 170
4 BHK24 of 58
3 BHK191 of 228

Booked, each quarter

Q3 2025-26124 of 456
Q4 2025-26160 of 456
Q1 2026-27205 of 456
Q2 2026-27271 of 456

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,206 sq ft
112 m² carpet · sizes 1,001–1,206 sq ft (116 at this size)
57 m² land share · 24 m² balcony/terrace · 1 parking space
228 homes · 50% of the project
3.5 BHK
1,345 sq ft
125 m² carpet
62 m² land share · 21 m² balcony/terrace · 1 parking space
170 homes · 37% of the project
4 BHK
1,647 sq ft
153 m² carpet
79 m² land share · 34 m² balcony/terrace · 1 parking space
58 homes · 13% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A29 floors
Tower B29 floors
Tower C29 floors
Tower D29 floors

Tower A: 114 homes, 102 m tall, 1 basement · Tower B: 114 homes, 102 m tall, 1 basement · Tower C: 114 homes, 102 m tall, 1 basement · Tower D: 114 homes, 102 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project56
Typical within 3 km (70)71
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project76%
Typical within 3 km (71)64%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
8.20 acres

33,184 m²

Ground covered by buildings
24% of the land

8,030 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.54 per home

596 covered, 108 open

Built-up area, all floors
10,78,392 sq ft

1,00,186 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of AMBERSTONE PROPERTIES on the map

The company

Registered as
AMBERSTONE PROPERTIES
Type
Partnership Firm
PAN
AATFC3415C
GSTIN
29AATFC3415C1ZI

The land is owned together with others (a joint development), including CAPSTONE PROPERTIES.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹61.6 crBuilding and development ₹532.2 crTotal ₹593.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹64.5 cr₹64.5 cr
Q4 2025-26₹37.6 cr₹33.6 cr
Q1 2026-27₹30.0 cr₹30.0 cr
Q2 2026-27₹60.9 cr₹42.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.26 kmReliable
  • Nearest railway station7.16 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)1.11 kmCaveat

Hospitals

  • Nearest hospital2.59 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)13.24 kmReliable
  • Nearest sewage treatment plant7.65 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)11.24 kmCaveat
  • Nearest commercial-airport runway32.84 kmReliable
  • Distance to runway approach-path proxy31.1 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.89541, 77.77073), 2026-10-24. Each figure's source and caveat are in the full report.