Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

VAISHNO AMBARAM

by VAISHNO VENTURES · 143 homes · 1.45 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Aug 2027. 85% built with 76% of the time used. 52% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
85% built

Due 30 Aug 2027. 76% of the time from RERA approval to the deadline has passed.

Built85%
Time used76%
How much is sold?69 left
52% booked

74 of 143 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
99 homes per acre

Similar projects within 3 km: 82 per acre. 88% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 1 past due with no completion filed, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started10 Jan 2024
  2. Approved by RERA28 Feb 2024
  3. Today24 Oct 2026

    76% of the time to the deadline has passed.

  4. If it slips like a typical project31 May 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2684%
Q4 2025-2676%
Q1 2026-2778%
Q2 2026-2785%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

74 booked69 leftQ2 2026-27

Still available: 69 × 3 BHK.

Booked, by type

3 BHK74 of 143

Booked, each quarter

Q3 2025-2661 of 143
Q4 2025-2664 of 143
Q1 2026-2774 of 143
Q2 2026-2774 of 143

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
818 sq ft
76 m² carpet · sizes 818–973 sq ft (48 at this size)
118 m² land share · 18 m² balcony/terrace · 1 parking space
143 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Vaishno Ambaram25 floors

Vaishno Ambaram: 143 homes, 79 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project99
Typical within 3 km (124)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project88%
Typical within 3 km (124)77%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.45 acres

5,857 m²

Ground covered by buildings
12% of the land

730 m²

Floor-area ratio
2.97

Floors built per unit of land: 2.97 m² of floors for each m² of land.

Parking
1.10 per home

158 covered, 0 open

Built-up area, all floors
2,51,122 sq ft

23,330 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of VAISHNO VENTURES on the map

The company

Registered as
VAISHNO VENTURES
Type
Partnership Firm
PAN
AATFV4676J
GSTIN
29AATFV4676J1Z3

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹25.0 lakhBuilding and development ₹75.9 crTotal ₹76.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹18.2 cr₹18.2 cr
Q4 2025-26₹9.6 cr₹10.8 cr
Q1 2026-27₹7.8 cr₹7.8 cr
Q2 2026-27₹7.9 cr₹7.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station6.19 kmReliable
  • Nearest railway station3.42 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)0.89 kmCaveat

Hospitals

  • Nearest hospital0.25 kmCaveat

Schools

  • Schools in pincode 560087 (UDISE+ census)55Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well33.1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.68 kmReliable
  • Nearest sewage treatment plant2.78 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.34 kmCaveat
  • Nearest commercial-airport runway29.64 kmReliable
  • Distance to runway approach-path proxy28.77 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (12.92134, 77.73400), 2026-10-24. Each figure's source and caveat are in the full report.