RERA project · Residential/Group Housing
VAISHNAVI RHAPSODY
by Vaishnavi Infrastructure and Properties LLP · 7 homes · 0.17 acres · 1 tower · Bengaluru North
Delivered late Completed: the builder filed for completion on 30 May 2023, 571 days after the date it first promised.
At a glance
The builder filed for completion on 30 May 2023, 571 days after the date it first promised.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 58 per acre. 36% of the land is left open.
Complaints to RERA about this project.
The RERA page doesn't say.
Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised).
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started16 May 2019
- Approved by RERA4 Jun 2020
- First promised5 Nov 2021
The date the builder gave at registration.
- Completion filed30 May 2023
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Vaishnavi Rhapsody: 7 homes
Amenities
- Electricity
- Swimming Pool
- Parks
- Power Backup
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 0.17 acres
- Ground covered by buildings
- 64% of the land
704 m²
449 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of Vaishnavi Infrastructure and Properties LLP on the map
The company
- Registered as
- Vaishnavi Infrastructure and Properties LLP
- Type
- Partnership Firm
- PAN
- AAQFV5575M
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/309/PR/200604/003444 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike
- Litigation on the landNot stated
- Litigation on the projectNot stated
Complaints to RERA about this project
None on RERA Karnataka.
Documents
96 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
- Land
- ₹59.6 lakh
- Construction
- ₹8.2 cr
- Total project cost
- ₹8.8 cr
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station2.64 kmReliable
- Nearest railway station0.59 kmReliable
- Bus stops within 500 m3Caveat
Parks, shops, daily needs
- Supermarkets within 1 km7Caveat
- Parks within 1 km7Caveat
- Nearest lake / water body (≥2 ha)1.49 kmCaveat
Hospitals
- Nearest hospital0.65 kmCaveat
Schools
- Schools in pincode 560005 (UDISE+ census)50Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km20Caveat
- Median pupil-teacher ratio, schools within 1 km23.6 :1Caveat
- Schools with library + playground + ICT lab (1 km)5Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionPulakeshinagar PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km1Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)11.48 kmReliable
- Nearest sewage treatment plant1.62 kmCaveat
- Industrial zones within 1 km4Caveat
- Nearest airfield runway (any, incl. military)6.52 kmCaveat
- Nearest commercial-airport runway21.99 kmReliable
- Distance to runway approach-path proxy19.46 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)1Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (13.00092, 77.62597), 2026-10-24. Each figure's source and caveat are in the full report.