Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

V2 VAJRA ELEGANCE

by V2 Holdings Housing Development Private Limited · 150 homes · 2.22 acres · 1 tower · Bengaluru South

Upcoming Under construction, due Dec 2029. 70% built with 41% of the time used. 39% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
70% built

Due 31 Dec 2029. 41% of the time from RERA approval to the deadline has passed.

Built70%
Time used41%
How much is sold?92 left
39% booked

58 of 150 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
68 homes per acre

Similar projects within 3 km: 83 per acre. 75% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?3 due so far
33% on time

Of its 4 RERA projects in Bengaluru Urban: 1 delivered on time, 2 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA12 Aug 2024
  2. Work started20 Aug 2024
  3. Today24 Oct 2026

    41% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2638%
Q4 2025-2654%
Q1 2026-2760%
Q2 2026-2770%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

58 booked92 leftQ2 2026-27

Still available: 20 × 2 BHK, 65 × 3 BHK, 7 × 4 BHK.

Booked, by type

2 BHK20 of 40
3 BHK35 of 100
4 BHK3 of 10

Booked, each quarter

Q3 2025-2650 of 150
Q4 2025-2652 of 150
Q1 2026-2755 of 150
Q2 2026-2758 of 150

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,199 sq ft
111 m² carpet · sizes 964–1,199 sq ft (20 at this size)
65 m² land share · 8 m² balcony/terrace · 1 parking space
100 homes · 67% of the project
2 BHK
819 sq ft
76 m² carpet · sizes 819–915 sq ft (10 at this size)
49 m² land share · 3 m² balcony/terrace · 1 parking space
40 homes · 27% of the project
4 BHK
1,433 sq ft
133 m² carpet
82 m² land share · 17 m² balcony/terrace · 1 parking space
10 homes · 7% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

V2 Vajra Elegance9 floors

V2 Vajra Elegance: 150 homes, 30 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (53)83
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project75%
Typical within 3 km (54)51%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.22 acres

8,970 m²

Ground covered by buildings
25% of the land

2,213 m²

Floor-area ratio
20168.90

Floors built per unit of land: 20168.90 m² of floors for each m² of land.

Parking
1.32 per home

198 covered, 0 open

Built-up area, all floors
2,92,068 sq ft

27,134 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 4 RERA projects of V2 Holdings Housing Development Private Limited on the map

The company

Registered as
V2 Holdings Housing Development Private Limited
Type
Company
Company number
U45201KA2007PTC044547

CIN or LLPIN, from the Registrar of Companies.

PAN
AACCV8810E
GSTIN
29AACCV8810E1Z9

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹39.9 crBuilding and development ₹81.6 crTotal ₹121.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹12.5 cr₹8.3 cr
Q4 2025-26₹8.5 cr₹6.7 cr
Q1 2026-27₹6.4 cr₹5.0 cr
Q2 2026-27₹3.0 cr₹2.1 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.16 kmReliable
  • Nearest railway station2.02 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.76 kmCaveat

Hospitals

  • Nearest hospital1.13 kmCaveat

Schools

  • Schools in pincode 560060 (UDISE+ census)105Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km20.1 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKengeri PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km3Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)14.22 kmReliable
  • Nearest sewage treatment plant0.73 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)19.36 kmCaveat
  • Nearest commercial-airport runway39.17 kmReliable
  • Distance to runway approach-path proxy33.89 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.89940, 77.48288), 2026-10-24. Each figure's source and caveat are in the full report.