Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

URBANEST ELITE 35

by URBANEST REALTY · 35 homes · 0.47 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Dec 2026. 100% built with 94% of the time used. 54% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
100% built

Due 31 Dec 2026. 94% of the time from RERA approval to the deadline has passed.

Built100%
Time used94%
How much is sold?16 left
54% booked

19 of 35 homes, as the builder reported for Q1 2026-27.

How crowded is it?About the same
74 homes per acre

Similar projects within 3 km: 69 per acre. 69% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started10 Oct 2023
  2. Approved by RERA5 Feb 2024
  3. Today24 Oct 2026

    94% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2698%
Q4 2025-26100%
Q1 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

19 booked16 leftQ1 2026-27

Still available: 16 × 3 BHK.

Booked, by type

3 BHK19 of 35

Booked, each quarter

Q3 2025-262 of 35
Q4 2025-2619 of 35
Q1 2026-2719 of 35

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
872 sq ft
81 m² carpet · sizes 872–1,150 sq ft (7 at this size)
57 m² land share · 42 m² balcony/terrace · 1 parking space
35 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Urbanest Elite 356 floors

Urbanest Elite 35: 35 homes, 21 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project74
Typical within 3 km (29)69
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project69%
Typical within 3 km (29)72%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.47 acres

1,921 m²

Ground covered by buildings
31% of the land

603 m²

Floor-area ratio
1.74

Floors built per unit of land: 1.74 m² of floors for each m² of land.

Parking
1.00 per home

35 covered, 0 open

Built-up area, all floors
60,579 sq ft

5,628 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
URBANEST REALTY
Type
Partnership Firm
PAN
AAFFU7438K
GSTIN
29AAFFU7438K1ZI

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including VATS ENTERPRISES, represented by its Managing Partners Ms. Avneet Hora Arya and Mr. Manish Sharma.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹1.0 crBuilding and development ₹7.3 crTotal ₹8.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹0.0 lakh₹0.0 lakh
Q1 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.73 kmReliable
  • Nearest railway station8.74 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.51 kmCaveat

Hospitals

  • Nearest hospital3.43 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAvalahally PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)1.65 kmReliable
  • Nearest sewage treatment plant2.18 kmCaveat
  • Industrial zones within 1 km6Caveat
  • Nearest airfield runway (any, incl. military)10.84 kmCaveat
  • Nearest commercial-airport runway12.95 kmReliable
  • Distance to runway approach-path proxy12.01 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.07324, 77.74235), 2026-10-24. Each figure's source and caveat are in the full report.