Delivered late Completed: the builder filed for completion on 27 Jul 2026, 392 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 27 Jul 2026, 392 days after the date it first promised.

How much is sold?21 left
36% booked

12 of 33 homes, as the builder reported for Q4 2025-26.

How crowded is it?About the same
82 homes per acre

Similar projects within 3 km: 79 per acre. 42% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started28 Dec 2023
  2. Approved by RERA4 May 2024
  3. First promised30 Jun 2025

    The date the builder gave at registration.

  4. Completion filed27 Jul 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-2670%
Q4 2025-26100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

12 booked21 leftQ4 2025-26

Still available: 12 × 2 BHK, 9 × 2.5 BHK.

Booked, by type

1 BHK1 of 1
2 BHK9 of 21
2.5 BHK2 of 11

Booked, each quarter

Q3 2025-269 of 33
Q4 2025-2612 of 33

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
737 sq ft
68 m² carpet · sizes 734–766 sq ft (12 at this size)
47 m² land share · 28 m² balcony/terrace · 1 parking space
21 homes · 64% of the project
2.5 BHK
829 sq ft
77 m² carpet · sizes 716–861 sq ft (3 at this size)
54 m² land share · 32 m² balcony/terrace · 1 parking space
11 homes · 33% of the project
1 BHK
471 sq ft
44 m² carpet
29 m² land share · 17 m² balcony/terrace · 1 parking space
1 home · 3% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Urban Village 13 floors

Urban Village 1: 33 homes, 12 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project82
Typical within 3 km (55)79
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project42%
Typical within 3 km (54)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.40 acres

1,619 m²

Ground covered by buildings
58% of the land

938 m²

Floor-area ratio
2.50

Floors built per unit of land: 2.50 m² of floors for each m² of land.

Parking
1.97 per home

29 covered, 36 open

Built-up area, all floors
41,872 sq ft

3,890 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
D Damodar Naidu
Type
Proprietorship
Website
https://www.urbanvillage.homes

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹50.1 lakhBuilding and development ₹8.7 crTotal ₹9.2 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹1.3 cr₹89.2 lakh
Q4 2025-26₹29.7 lakh₹20.8 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.57 kmReliable
  • Nearest railway station3.41 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)0.78 kmCaveat

Hospitals

  • Nearest hospital0.95 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km1Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.34 kmReliable
  • Nearest sewage treatment plant1.87 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)5.35 kmCaveat
  • Nearest commercial-airport runway18.52 kmReliable
  • Distance to runway approach-path proxy16.75 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.02667, 77.76757), 2026-10-24. Each figure's source and caveat are in the full report.