Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

UNITED PROJECTS DREAMCITY

by UNITED PROJECTS · 394 homes · 4.70 acres · 5 towers · Bengaluru East

Upcoming Under construction, due Dec 2028. 100% built with 64% of the time used. 87% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
100% built

Due 31 Dec 2028. 64% of the time from RERA approval to the deadline has passed.

Built100%
Time used64%
How much is sold?53 left
87% booked

341 of 394 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
84 homes per acre

Similar projects within 3 km: 68 per acre. 74% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?3 due so far
33% on time

Of its 4 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 1 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started5 Oct 2022
  2. Approved by RERA6 Dec 2022
  3. Today24 Oct 2026

    64% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2693%
Q4 2025-2698%
Q1 2026-27100%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Wing 1100%
Wing 2100%
Wing 3100%
Wing 4100%
Wing 5100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

341 booked53 leftQ2 2026-27

Still available: 32 × 2 BHK, 19 × 2.5 BHK, 2 × 3 BHK.

Booked, by type

2 BHK52 of 84
2.5 BHK173 of 192
DUPLEX26 of 26
3 BHK90 of 92

Booked, each quarter

Q3 2025-26322 of 394
Q4 2025-26327 of 394
Q1 2026-27327 of 394
Q2 2026-27341 of 394

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2.5 BHK
802 sq ft
74 m² carpet · sizes 801–855 sq ft (48 at this size)
44 m² land share · 11 m² balcony/terrace · 1 parking space
192 homes · 49% of the project
3 BHK
997 sq ft
93 m² carpet · sizes 988–1,073 sq ft (28 at this size)
55 m² land share · 13 m² balcony/terrace · 1 parking space
92 homes · 23% of the project
2 BHK
746 sq ft
69 m² carpet · sizes 744–777 sq ft (36 at this size)
40 m² land share · 10 m² balcony/terrace · 1 parking space
84 homes · 21% of the project
DUPLEX
1,309 sq ft
122 m² carpet · sizes 1,307–1,988 sq ft (3 at this size)
72 m² land share · 17 m² balcony/terrace · 1 parking space
26 homes · 7% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing 114 floors
Wing 214 floors
Wing 314 floors
Wing 414 floors
Wing 514 floors

Wing 1: 91 homes, 45 m tall, 1 basement · Wing 2: 92 homes, 45 m tall, 1 basement · Wing 3: 78 homes, 45 m tall, 1 basement · Wing 4: 54 homes, 45 m tall, 1 basement · Wing 5: 79 homes, 45 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project84
Typical within 3 km (35)68
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project74%
Typical within 3 km (35)72%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.70 acres

19,008 m²

Ground covered by buildings
26% of the land

4,899 m²

Floor-area ratio
2.50

Floors built per unit of land: 2.50 m² of floors for each m² of land.

Parking
2.20 per home

381 covered, 52 open

Built-up area, all floors
6,60,139 sq ft

61,329 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 4 RERA projects of UNITED PROJECTS on the map

The company

Registered as
UNITED PROJECTS
Type
Partnership Firm
PAN
AAGFU6389Q
GSTIN
29AAGFU6389Q1ZX
Website
www.unitedproject.in

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹56.3 crBuilding and development ₹198.5 crTotal ₹254.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹15.1 cr₹11.0 cr
Q4 2025-26₹20.1 cr₹14.3 cr
Q1 2026-27₹25.1 cr₹16.9 cr
Q2 2026-27₹26.6 cr₹18.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station6.79 kmReliable
  • Nearest railway station6.67 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)1.03 kmCaveat

Hospitals

  • Nearest hospital1.91 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAvalahally PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.84 kmReliable
  • Nearest sewage treatment plant1.02 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)7.77 kmCaveat
  • Nearest commercial-airport runway15.29 kmReliable
  • Distance to runway approach-path proxy13.49 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.05657, 77.76637), 2026-10-24. Each figure's source and caveat are in the full report.