At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 15 Apr 2024, by the date it promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
79 homes per acre

Similar projects within 3 km: 80 per acre. 51% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?1 due so far
100% on time

Of its 3 RERA projects in Bengaluru Urban: 1 delivered on time, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started7 Feb 2020
  2. Approved by RERA26 Feb 2020
  3. Completion filed15 Apr 2024

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

  4. First promised31 Dec 2024

    The date the builder gave at registration.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
755 sq ft
70 m² carpet · sizes 721–844 sq ft (32 at this size)
47 m² land share · 1 parking space
124 homes · 53% of the project
3BHK
1,017 sq ft
94 m² carpet · sizes 879–1,109 sq ft (24 at this size)
58 m² land share · 1 parking space
68 homes · 29% of the project
2 BHK
755 sq ft
70 m² carpet · sizes 755–794 sq ft (12 at this size)
47 m² land share · 1 parking space
24 homes · 10% of the project
3 BHK
872 sq ft
81 m² carpet · sizes 872–1,002 sq ft (4 at this size)
60 m² land share · 1 parking space
16 homes · 7% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

A14 floors
A24 floors
A34 floors
A44 floors
A54 floors
A64 floors

A1: 40 homes · A2: 40 homes · A3: 40 homes · A4: 40 homes · A5: 36 homes · A6: 36 homes

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project79
Typical within 3 km (131)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project51%
Typical within 3 km (131)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.93 acres

11,859 m²

Ground covered by buildings
49% of the land

5,853 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of United Infrastructures on the map

The company

Registered as
M/s. UNITED INFRASTRUCTURES
Type
Partnership Firm
PAN
AAGFU1007R

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹8.5 cr
Construction
₹81.5 cr
Total project cost
₹90.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.34 kmReliable
  • Nearest railway station4.67 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km6Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)1.25 kmCaveat

Hospitals

  • Nearest hospital1 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.73 kmReliable
  • Nearest sewage treatment plant0.9 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)4.11 kmCaveat
  • Nearest commercial-airport runway26.85 kmReliable
  • Distance to runway approach-path proxy26.18 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (12.94654, 77.72192), 2026-10-24. Each figure's source and caveat are in the full report.