UMIYA PRISM

by UMIYA BUILDTEK · 9 homes · 0.44 acres · 1 tower · Bengaluru North

Upcoming Under construction, due Mar 2029. 13% built with 18% of the time used. 11% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
13% built

Due 31 Mar 2029. 18% of the time from RERA approval to the deadline has passed.

Built13%
Time used18%
How much is sold?8 left
11% booked

1 of 9 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
21 homes per acre

Similar projects within 3 km: 48 per acre. 57% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Apr 2026
  2. Approved by RERA18 Apr 2026
  3. Today24 Oct 2026

    18% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q1 2026-276%
Q2 2026-2713%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

1 booked8 leftQ2 2026-27

Still available: 8 × 4 BHK.

Booked, by type

4 BHK1 of 9

Booked, each quarter

Q1 2026-271 of 9
Q2 2026-271 of 9

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4 BHK
3,726 sq ft
346 m² carpet · sizes 3,726–4,096 sq ft (6 at this size)
194 m² land share · 87 m² balcony/terrace · 2 parking spaces
9 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Umiya Prism4 floors

Umiya Prism: 9 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project21
Typical within 3 km (35)48
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project57%
Typical within 3 km (36)52%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.44 acres

1,765 m²

Ground covered by buildings
43% of the land

756 m²

Floor-area ratio
2.24

Floors built per unit of land: 2.24 m² of floors for each m² of land.

Parking
2.78 per home

25 covered, 0 open

Built-up area, all floors
61,300 sq ft

5,695 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
UMIYA BUILDTEK
Type
Partnership Firm
PAN
AAIFU7757L
GSTIN
29AAIFU7757L1Z7
Website
www.umiyaindia.com

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹82.5 crBuilding and development ₹24.3 crTotal ₹106.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q1 2026-27₹8.7 cr₹6.1 cr
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.92 kmReliable
  • Nearest railway station0.58 kmReliable
  • Bus stops within 500 m5Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km13Caveat
  • Nearest lake / water body (≥2 ha)1.74 kmCaveat

Hospitals

  • Nearest hospital0.11 kmCaveat

Schools

  • Schools in pincode 560052 (UDISE+ census)10Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km11Caveat
  • Median pupil-teacher ratio, schools within 1 km22.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionHigh Grounds PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km5Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well30.3 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.82 kmReliable
  • Nearest sewage treatment plant1.14 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)7.76 kmCaveat
  • Nearest commercial-airport runway24.43 kmReliable
  • Distance to runway approach-path proxy20.87 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.98905, 77.59552), 2026-10-24. Each figure's source and caveat are in the full report.