RERA project · Residential/Group Housing
ULTIMA
by sai kalyan builders and developers private limited · 364 homes · 4.00 acres · 5 towers · Bengaluru North
Past due, no completion filed Past its deadline of 31 Jan 2020, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.
At a glance
The deadline was 31 Jan 2020, and no completion is filed.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 74 per acre. 81% of the land is left open.
Complaints to RERA about this project.
The RERA page doesn't say.
Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 1 past due with no completion filed.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started3 Jan 2016
- Approved by RERA21 Oct 2017
- First promised31 Jan 2019
The date the builder gave at registration.
- Deadline (extended)31 Jan 2020
Passed with no completion filed.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.
Towers
Block A: 82 homes, 2 basements · Block B: 82 homes, 2 basements · Block C: 82 homes, 2 basements · Block D: 82 homes, 2 basements · Block E: 36 homes, 2 basements
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Air Conditioning And incerntion
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 4.00 acres
- Ground covered by buildings
- 19% of the land
16,181 m²
3,004 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 3 RERA projects of sai kalyan builders and developers private limited on the map
The company
- Registered as
- sai kalyan builders and developers private limited
- Type
- Company
- Company number
- U45205KA2013PTC069809
- PAN
- AATCS2662N
CIN or LLPIN, from the Registrar of Companies.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/309/PR/171021/001218 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike
- Litigation on the landNot stated
- Litigation on the projectNot stated
Complaints to RERA about this project
- Project completion pending 24 Mar 2023 · Disposed Authority Fullbench
- Incomplete Project - Unsafe to stay inside a under construction site 24 Mar 2023 · Disposed Authority Fullbench
- Project still not completed 24 Mar 2023 · Disposed Authority Fullbench
- Incomplete construction of Ultima Smart Homes 24 Mar 2023 · Posted For Orders Authority Fullbench
- Incomplete Construction and Compensation 24 Mar 2023 · Disposed Authority Fullbench
- Project completion pending 27 Mar 2023 · Disposed Authority Fullbench
- Incomplete Construction 27 Mar 2023 · Disposed Authority Fullbench
- Incomplete Construction 27 Mar 2023 · Disposed Authority Fullbench
- Completion of Pending Amenities and Compensation for the Delay 1 Apr 2023 · Disposed Authority Fullbench
- Project is not completed on time and builder does not have intention to complete it 1 Apr 2023 · Disposed Authority Fullbench
- M/s. ULTIMA SMART HOMES OWNERS' ASSOCIATION- Incomplete Amenities 3 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 3 Apr 2023 · Disposed Authority Fullbench
- in complete amenities and compensation for the delayed project 3 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction 10 Apr 2023 · Disposed Authority Fullbench
- Incomplete Project, No Maintainance 12 Apr 2023 · Disposed Authority Fullbench
- Incomplete construction and compensation 12 Apr 2023 · Disposed Authority Fullbench
- Incomplete amenities and project 12 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction and compensation 12 Apr 2023 · Disposed Authority Fullbench
- In complete amenities and compensation for the delayed project 12 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 13 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 13 Apr 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for delay 13 Apr 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for delay 15 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction 15 Apr 2023 · Disposed Authority Fullbench
- Pending amenities and Compensation for delay 15 Apr 2023 · Disposed Authority Fullbench
- Pending amenities and Compensation for delay 17 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction 17 Apr 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for delay 17 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 18 Apr 2023 · Disposed Authority Fullbench
- Incomplete Amenities 20 Apr 2023 · Disposed Authority Fullbench
- 1. Non completion of amenities in terms of Construction agreement and not handing over of completed project in all respect to RWA as set out . 20 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 24 Apr 2023 · Disposed Authority Fullbench
- Incomplete construction 26 Apr 2023 · Disposed Authority Fullbench
- PENDING AMENITIES AND COMPENSATION FOR DELAY. 27 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction 28 Apr 2023 · Disposed Authority Fullbench
- 5 years of suffering to owners due to non completion of project. 29 Apr 2023 · Disposed Authority Fullbench
- Incomplete Construction, amenities and Compensation 29 Apr 2023 · Disposed Authority Fullbench
- incomplete amenities 2 May 2023 · Disposed Authority Fullbench
- IN COMPLETE PROJECT 2 May 2023 · Disposed Authority Fullbench
- Project completion pending 2 May 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for Delay in project completion 2 May 2023 · Disposed Authority Fullbench
- Project Incomplete and Compensation for Delay 2 May 2023 · Disposed Authority Fullbench
- Incomplete project and no amenities 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction 2 May 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for delay 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction 2 May 2023 · Disposed Authority Fullbench
- Amenities 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Amenities even after more than 2 years of due date 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Pending Amenities, Compensation for Delay and full OC of Project 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for delay 2 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 2 May 2023 · Disposed Authority Fullbench
- Pending Amenities, Breach of agreement, 3 May 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 3 May 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for delay 3 May 2023 · Disposed Authority Fullbench
- Project and Amenities Incomplete 3 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 4 May 2023 · Disposed Authority Fullbench
- INCOMPLETION OF PROJECT 5 May 2023 · Disposed Authority Fullbench
- Project completion pending 5 May 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 8 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 8 May 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for delay 8 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 8 May 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay in completion of project 8 May 2023 · Disposed Authority Fullbench
- Incomplete construction and compensation 9 May 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 9 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 9 May 2023 · Disposed Authority Fullbench
- No amenities work being done for more than a year 9 May 2023 · Disposed Authority Fullbench
- Incomplete construction and compensation 9 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 9 May 2023 · Disposed Authority Fullbench
- Builder has not completed the amenities and also the timeline of RERA completion has lapsed by more than 2 years 16 May 2023 · Disposed Authority Fullbench
- Pending Amenities, Poor Quality of work, Pending in obtaining OC, Delay in compensation etc., 16 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 16 May 2023 · Disposed Authority Fullbench
- Incomplete construction and delayed project 16 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 16 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 16 May 2023 · Disposed Authority Fullbench
- Construction is incomplete 16 May 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 16 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 16 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 16 May 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for delay 16 May 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 16 May 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for the delay 16 May 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for Delay 17 May 2023 · Disposed Authority Fullbench
- Pending Amenities 18 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 22 May 2023 · Disposed Authority Fullbench
- ULTIMA SMART HOMES - Incomplete Amenities 22 May 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 22 May 2023 · Disposed Authority Fullbench
- Incomplete Construction 22 May 2023 · Disposed Authority Fullbench
- Incomplete Construction 22 May 2023 · Disposed Authority Fullbench
- Incomplete amenities & delay in complete handover 22 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 22 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 22 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 23 May 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensenation for the delay 24 May 2023 · Disposed Authority Fullbench
- Incomplete project 26 May 2023 · Disposed Authority Fullbench
- Pending Amenities 29 May 2023 · Disposed Authority Fullbench
- Incomplete Construction 29 May 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay. 30 May 2023 · Disposed Authority Fullbench
- Incomplete Construction , No OC till Date and Compensation 30 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 30 May 2023 · Disposed Authority Fullbench
- Incomplete construction and compensation for delay 30 May 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 30 May 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for delay 30 May 2023 · Disposed Authority Fullbench
- Pending Amenities and Delay of Project Completion , Pending Penality and compensation to Residents 30 May 2023 · Disposed Authority Fullbench
- Pending amenities and Compensation for delay 30 May 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for delay 31 May 2023 · Disposed Authority Fullbench
- Pending Amenities 31 May 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for delay 31 May 2023 · Disposed Authority Fullbench
- Incomplete construction and compensation 31 May 2023 · Disposed Authority Fullbench
- Incomplete Amenities 31 May 2023 · Disposed Authority Fullbench
- Incompleteness of society 1 Jun 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 1 Jun 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for delay 3 Jun 2023 · Disposed Authority Fullbench
- Incomplete property 3 Jun 2023 · Disposed Authority Fullbench
- Incomplete construction and compensation for delay 5 Jun 2023 · Disposed Authority Fullbench
- Incomplete and pending amenities 5 Jun 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 5 Jun 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 5 Jun 2023 · Disposed Authority Fullbench
- Incomplete Construction 5 Jun 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 5 Jun 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for delay in completion of project 5 Jun 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 5 Jun 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 5 Jun 2023 · Disposed Authority Fullbench
- Pending amenities, OC and compensation for delay 5 Jun 2023 · Disposed Authority Fullbench
- Pending amenities and Compensation for delay 6 Jun 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 8 Jun 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for Delay 9 Jun 2023 · Disposed Authority Fullbench
- Incomplete amenities in Sai Kalyan Ultima Smart homes apartment 13 Jun 2023 · Disposed Authority Fullbench
- 1. Pending of amenities, Car parking allotment, Occupancy Certificate, Apartment Exterior and common area painting. 2. Delay in RWA formation and delay in handing over maintenance to RWA. 16 Jun 2023 · Disposed Authority Fullbench
- PENDING AMENIETIES AND COMPENSATION FOR DELAY 21 Jun 2023 · Disposed Authority Fullbench
- Pending Amenities , Pending Occupancy Certificate , 21 Jun 2023 · Disposed Authority Fullbench
- Pending Amenities and Compensation for Delay 21 Jun 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for the delay 22 Jun 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 22 Jun 2023 · Disposed Authority Fullbench
- Pending ameneties and Compensation of the delay 29 Jun 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 29 Jun 2023 · Disposed Authority Fullbench
- Incomplete Amenities and basic infrastructure 11 Jul 2023 · Disposed Authority Fullbench
- Pending Amenities and compensation for delay 11 Jul 2023 · Disposed Authority Fullbench
- PENDING AMENITIES AND COMPENSATION FOR DELAY 11 Jul 2023 · Disposed Authority Fullbench
- PROJECT NOT COMPLETED AND AMENITIES WORK PENDING 20 Jul 2023 · Disposed Authority Fullbench
- Pending amenities 25 Jul 2023 · Disposed Authority Fullbench
- Pending amenities and Compensation delay 25 Jul 2023 · Disposed Authority Fullbench
- Pending amenities and compensation for delays 25 Jul 2023 · Disposed Authority Fullbench
- Pending Amenities, Poor quality of work 25 Jul 2023 · Disposed Authority Fullbench
- Pending amenities and Compensation for delay 25 Jul 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 25 Jul 2023 · Disposed Authority Fullbench
- pending amenities and compensation for delay 9 Aug 2023 · Disposed Authority Fullbench
- Project still not completed. Pending amenities 14 Aug 2023 · Disposed Authority Fullbench
- Incomplete construction and Full OC 17 Aug 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 7 Nov 2023 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 4 Jun 2024 · Disposed Authority Fullbench
- Complaint against Builder for Non-fulfillment of Promises and Delayed Completion of Project 4 Jun 2024 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 7 Jun 2024 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 12 Jun 2024 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 12 Jun 2024 · Disposed Authority Fullbench
- Pending amenities and compensation for delay 13 Aug 2024 · Disposed Authority Fullbench
- Incomplete Construction and Compensation 10 Sep 2024 · Disposed Authority Fullbench
- Incomplete construction and compensation 21 Mar 2025 · Disposed Authority Fullbench
Documents
55 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
- Land
- ₹50.7 cr
- Construction
- ₹71.6 cr
- Total project cost
- ₹80.4 cr
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station7.84 kmReliable
- Nearest railway station4.76 kmReliable
- Bus stops within 500 m2Caveat
Parks, shops, daily needs
- Supermarkets within 1 km1Caveat
- Parks within 1 km11Caveat
- Nearest lake / water body (≥2 ha)1.59 kmCaveat
Hospitals
- Nearest hospital0.56 kmCaveat
Schools
- Schools in pincode 560077 (UDISE+ census)123Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km20Caveat
- Median pupil-teacher ratio, schools within 1 km22.4 :1Caveat
- Schools with library + playground + ICT lab (1 km)7Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionSampigehalli PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km1Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)yesCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km1Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)5.43 kmReliable
- Nearest sewage treatment plant2.01 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)3.6 kmCaveat
- Nearest commercial-airport runway16.12 kmReliable
- Distance to runway approach-path proxy13.25 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)2Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat
ReliableFrom our location report at the builder-entered pin (13.05738, 77.62744), 2026-10-24. Each figure's source and caveat are in the full report.