by UDBHAV BUILDERS AND DEVELOPERS · 179 homes · 1.87 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Mar 2027. 86% built with 85% of the time used. 61% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
86% built

Due 31 Mar 2027. 85% of the time from RERA approval to the deadline has passed.

Built86%
Time used85%
How much is sold?70 left
61% booked

109 of 179 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
96 homes per acre

Similar projects within 3 km: 80 per acre. 53% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started25 Apr 2024
  2. Approved by RERA4 May 2024
  3. Today24 Oct 2026

    85% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2660%
Q4 2025-2644%
Q1 2026-2762%
Q2 2026-2786%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Wing 286%
Wing 186%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

109 booked70 leftQ2 2026-27

Still available: 30 × 2 BHK, 40 × 3 BHK.

Booked, by type

2 BHK10 of 40
3 BHK99 of 139

Booked, each quarter

Q3 2025-2656 of 179
Q4 2025-2682 of 179
Q1 2026-2795 of 179
Q2 2026-27109 of 179

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
984 sq ft
91 m² carpet · sizes 872–1,112 sq ft (20 at this size)
44 m² land share · 15 m² balcony/terrace · 1 parking space
139 homes · 78% of the project
2 BHK
814 sq ft
76 m² carpet · sizes 723–814 sq ft (15 at this size)
35 m² land share · 10 m² balcony/terrace · 1 parking space
40 homes · 22% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing 24 floors
Wing 14 floors

Wing 2: 90 homes, 15 m tall, 1 basement · Wing 1: 89 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project96
Typical within 3 km (148)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project53%
Typical within 3 km (148)73%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.87 acres

7,579 m²

Ground covered by buildings
47% of the land

3,584 m²

Floor-area ratio
17754.00

Floors built per unit of land: 17754.00 m² of floors for each m² of land.

Parking
2.21 per home

191 covered, 7 open

Built-up area, all floors
2,64,609 sq ft

24,583 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
UDBHAV BUILDERS AND DEVELOPERS
Type
Partnership Firm
PAN
AAHFU1152A
GSTIN
29AAHFU1152A1ZI

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹34.1 crBuilding and development ₹121.7 crTotal ₹155.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹14.0 cr₹9.5 cr
Q4 2025-26₹19.6 cr₹12.6 cr
Q1 2026-27₹18.0 cr₹13.3 cr
Q2 2026-27₹11.6 cr₹6.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.07 kmReliable
  • Nearest railway station4.2 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)1.15 kmCaveat

Hospitals

  • Nearest hospital1.81 kmCaveat

Schools

  • Schools in pincode 560087 (UDISE+ census)55Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well33.1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.71 kmReliable
  • Nearest sewage treatment plant0.99 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)4.71 kmCaveat
  • Nearest commercial-airport runway27.59 kmReliable
  • Distance to runway approach-path proxy26.86 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (12.93983, 77.72605), 2026-10-24. Each figure's source and caveat are in the full report.