Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

TVS EMERALD ALTURA

by EMERALD HAVEN PROPERTIES PRIVATE LIMITED · 975 homes · 11.12 acres · 12 towers · Bengaluru North

Upcoming Under construction, due Mar 2033. 22% built with 8% of the time used. 48% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
22% built

Due 29 Mar 2033. 8% of the time from RERA approval to the deadline has passed.

Built22%
Time used8%
How much is sold?509 left
48% booked

466 of 975 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
88 homes per acre

Similar projects within 3 km: 77 per acre. 76% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA4 Apr 2026
  2. Work started6 Apr 2026
  3. Today24 Oct 2026

    8% of the time to the deadline has passed.

  4. If it slips like a typical project29 Dec 2033

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q1 2026-2715%
Q2 2026-2722%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 14%
Tower 23%
Tower 33%
Tower 40%
Tower 53%
Tower 65%
Tower 70%
Tower 81%
Tower 90%
Tower 100%
Tower 110%
Tower 120%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

466 booked509 leftQ2 2026-27

Still available: 6 × 1 BHK, 106 × 2BHK Classic, 114 × 3BHK Luxe, 36 × 2BHK Premium, 103 × 3BHK Classic, 144 × 3BHK Premium.

Booked, by type

1 BHK4 of 10
2BHK Classic167 of 273
3BHK Luxe14 of 128
2BHK Premium118 of 154
3BHK Classic112 of 215
3BHK Premium51 of 195

Booked, each quarter

Q1 2026-270 of 847
Q2 2026-27466 of 975

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2BHK Classic
714 sq ft
66 m² carpet · sizes 701–732 sq ft (126 at this size)
26 m² land share · 4 m² balcony/terrace · 1 parking space
273 homes · 28% of the project
3BHK Classic
960 sq ft
89 m² carpet · sizes 960–987 sq ft (52 at this size)
37 m² land share · 8 m² balcony/terrace · 1 parking space
215 homes · 22% of the project
3BHK Premium
1,194 sq ft
111 m² carpet · sizes 1,135–1,194 sq ft (65 at this size)
44 m² land share · 9 m² balcony/terrace · 1 parking space
195 homes · 20% of the project
2BHK Premium
771 sq ft
72 m² carpet
29 m² land share · 5 m² balcony/terrace · 1 parking space
154 homes · 16% of the project
3BHK Luxe
1,277 sq ft
119 m² carpet · sizes 1,277–1,339 sq ft (39 at this size)
49 m² land share · 10 m² balcony/terrace · 1 parking space
128 homes · 13% of the project
1 BHK
507 sq ft
47 m² carpet · sizes 507–766 sq ft (4 at this size)
20 m² land share · 4 m² balcony/terrace · 1 parking space
10 homes · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 112 floors
Tower 212 floors
Tower 312 floors
Tower 412 floors
Tower 512 floors
Tower 612 floors
Tower 712 floors
Tower 812 floors
Tower 912 floors
Tower 1012 floors
Tower 1112 floors
Tower 1212 floors

Tower 1: 104 homes, 39 m tall, 2 basements · Tower 2: 78 homes, 39 m tall, 2 basements · Tower 3: 78 homes, 39 m tall, 2 basements · Tower 4: 78 homes, 39 m tall, 2 basements · Tower 5: 104 homes, 39 m tall, 2 basements · Tower 6: 104 homes, 39 m tall, 2 basements · Tower 7: 65 homes, 39 m tall, 2 basements · Tower 8: 78 homes, 39 m tall, 2 basements · Tower 9: 91 homes, 39 m tall, 2 basements · Tower 10: 52 homes, 39 m tall, 2 basements · Tower 11: 78 homes, 39 m tall, 2 basements · Tower 12: 65 homes, 39 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project88
Typical within 3 km (31)77
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project76%
Typical within 3 km (32)66%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
11.12 acres

45,021 m²

Ground covered by buildings
24% of the land

10,615 m²

Floor-area ratio
2.99

Floors built per unit of land: 2.99 m² of floors for each m² of land.

Parking
1.15 per home

975 covered, 145 open

Built-up area, all floors
18,60,691 sq ft

1,72,864 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
EMERALD HAVEN PROPERTIES PRIVATE LIMITED
Type
Company
Company number
U68100TN2024PTC166589

CIN or LLPIN, from the Registrar of Companies.

PAN
AAHCE9590K
GSTIN
29AAHCE9590K1ZT
Website
www.tvsemerald.com

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹536.4 crBuilding and development ₹708.0 crTotal ₹1244.4 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q1 2026-27₹0.0 lakh₹0.0 lakh
Q2 2026-27₹158.0 cr₹87.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station14.25 kmReliable
  • Nearest railway station4.87 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)1.04 kmCaveat

Hospitals

  • Nearest hospital0.4 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBagalur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km27Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.34 kmReliable
  • Nearest sewage treatment plant4.14 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)2.28 kmCaveat
  • Nearest commercial-airport runway9.61 kmReliable
  • Distance to runway approach-path proxy6.08 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.12324, 77.63278), 2026-10-24. Each figure's source and caveat are in the full report.