Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

TRIFECTA RETTO

by TRIFECTA PROJECTS PRIVATE LIMITED · 188 homes · 2.08 acres · 2 towers · Bengaluru South

Delivered on time Completed: the builder filed for completion on 23 Dec 2025, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 23 Dec 2025, by the date it promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
91 homes per acre

Similar projects within 3 km: 70 per acre. 88% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
100% on time

Of its 6 RERA projects in Bengaluru Urban: 2 delivered on time, 4 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started23 Feb 2023
  2. Approved by RERA6 Apr 2023
  3. Completion filed23 Dec 2025

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3 BHK
850 sq ft
79 m² carpet · sizes 775–861 sq ft (47 at this size)
47 m² land share · 25 m² balcony/terrace · 1 parking space
116 homes · 62% of the project
2 BHK
710 sq ft
66 m² carpet · sizes 710–753 sq ft (24 at this size)
40 m² land share · 22 m² balcony/terrace · 1 parking space
72 homes · 38% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A23 floors
B23 floors

A: 94 homes, 73 m tall, 1 basement · B: 94 homes, 76 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project91
Typical within 3 km (71)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project88%
Typical within 3 km (71)73%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.08 acres

8,398 m²

Ground covered by buildings
12% of the land

987 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.11 per home

195 covered, 14 open

Built-up area, all floors
2,99,592 sq ft

27,833 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 6 RERA projects of TRIFECTA PROJECTS PRIVATE LIMITED on the map

Complaints to RERA about its other projects

The company

Registered as
TRIFECTA PROJECTS PRIVATE LIMITED
Type
Company
Company number
U45200KA2012PTC062831

CIN or LLPIN, from the Registrar of Companies.

PAN
AACCE9717F
GSTIN
29AACCE9717F1ZG

Its other registrations on RERA Karnataka

10 registrations under this company
  • Trifecta Veranza PRM/KA/RERA/1251/308/PR/210126/008418 · approved 21 Jan 2026
  • TRIFECTA VANTO PHASE-2 PRM/KA/RERA/1251/310/PR/250625/007871 · approved 25 Jun 2025
  • TRIFECTA VERDE EN RESPLANDOR VILLA PHASE 3 PRM/KA/RERA/1251/446/PR/230125/007422 · approved 23 Jan 2025
  • TRIFECTA VANTO PHASE-1 PRM/KA/RERA/1251/446/PR/190424/006813 · approved 19 Apr 2024
  • TRIFECTA VERDEEN RESPLANDOR ROW HOUSE PHASE-3 PRM/KA/RERA/1251/446/PR/060424/006778 · approved 6 Apr 2024
  • TRIFECTA VERDE ENRESPLANDOR VILLA PHASE-2 PRM/KA/RERA/1250/304/PR/101122/005447 · approved 10 Nov 2022
  • TRIFECTA VERDE EN RESPLANDOR ROW HOUSE PHASE-2 PRM/KA/RERA/1250/304/PR/200922/005254 · approved 20 Sep 2022
  • TRIFECTA VERDE EN RESPLANDOR PHASE 1 PRM/KA/RERA/1250/304/PR/210319/004025 · approved 19 Mar 2021
  • TRIFECTA BUENO PRM/KA/RERA/1251/446/PR/210129/003798 · approved 29 Jan 2021
  • Trifecta Verde En Resplendor PRM/KA/RERA/1250/304/PR/200323/003374 · approved 23 Mar 2020

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹95.0 lakhBuilding and development ₹83.5 crTotal ₹84.4 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station6.68 kmReliable
  • Nearest railway station2.39 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)0.6 kmCaveat

Hospitals

  • Nearest hospital1.52 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.34 kmReliable
  • Nearest sewage treatment plant3.8 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)7.8 kmCaveat
  • Nearest commercial-airport runway33.3 kmReliable
  • Distance to runway approach-path proxy32.66 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (12.88819, 77.71596), 2026-10-24. Each figure's source and caveat are in the full report.