TNM LAKEVIEW

by Y V CONSTRUCTIONS · 36 homes · 0.43 acres · 1 tower · Bengaluru North

Delivered late Completed: the builder filed for completion on 21 Oct 2026, 355 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 21 Oct 2026, 355 days after the date it first promised.

How much is sold?0 left
100% booked

36 of 36 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
83 homes per acre

Similar projects within 3 km: 70 per acre. 60% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
50% on time

Of its 3 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Jan 2024
  2. Approved by RERA21 Mar 2024
  3. First promised31 Oct 2025

    The date the builder gave at registration.

  4. Completion filed21 Oct 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-2690%
Q4 2025-2695%
Q1 2026-2798%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

36 booked0 leftQ2 2026-27

Booked, by type

2 BHK20 of 20
3 BHK16 of 16

Booked, each quarter

Q3 2025-2620 of 36
Q4 2025-262 of 36
Q1 2026-2728 of 36
Q2 2026-2736 of 36

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
  • 626 sq ft4 homes58.2 m²
  • 628 sq ft4 homes58.3 m²
  • 616 sq ft3 homes57.2 m²
  • 640 sq ft3 homes59.5 m²
  • and 6 homes in other sizes
Typically 32 m² land share · 9 m² balcony/terrace · 1 parking space
20 homes · 56% of the project
3 BHK
  • 863 sq ft4 homes80.2 m²
  • 997 sq ft4 homes92.6 m²
  • 905 sq ft3 homes84.1 m²
  • 934 sq ft3 homes86.8 m²
  • and 2 homes in other sizes
Typically 47 m² land share · 14 m² balcony/terrace · 1 parking space
16 homes · 44% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tnm Lakewiew3 floors

Tnm Lakewiew: 36 homes, 11 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project83
Typical within 3 km (31)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project60%
Typical within 3 km (31)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.43 acres

1,760 m²

Ground covered by buildings
40% of the land

704 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
2.53 per home

55 covered, 36 open

Built-up area, all floors
42,270 sq ft

3,927 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of Y V CONSTRUCTIONS on the map

The company

Registered as
Y V CONSTRUCTIONS
Type
Proprietorship

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹6.0 crBuilding and development ₹10.0 crTotal ₹16.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹1.0 lakh₹3.5 lakh
Q4 2025-26₹19.0 lakh₹0.0 lakh
Q1 2026-27₹1.4 cr₹1.1 cr
Q2 2026-27₹7.0 lakh₹7.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station13.31 kmReliable
  • Nearest railway station3.62 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)0.77 kmCaveat

Hospitals

  • Nearest hospital0.34 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km8Caveat
  • Median pupil-teacher ratio, schools within 1 km32.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionYelahanka PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well16.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km25Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.23 kmReliable
  • Nearest sewage treatment plant2.91 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)1.65 kmCaveat
  • Nearest commercial-airport runway10.64 kmReliable
  • Distance to runway approach-path proxy6.12 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.12157, 77.62071), 2026-10-24. Each figure's source and caveat are in the full report.