Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

The Right Life

by NEOBUILD VENTURES LLP · 683 homes · 15.44 acres · 3 towers · Bengaluru East

Upcoming Under construction, due Dec 2035. 43% built with 22% of the time used. 52% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
43% built

Due 31 Dec 2035. 22% of the time from RERA approval to the deadline has passed.

Built43%
Time used22%
How much is sold?414 left
52% booked

450 of 864 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
44 homes per acre

Similar projects within 3 km: 76 per acre. 94% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 5 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA28 Mar 2024
  2. Work started1 Apr 2024
  3. Today24 Oct 2026

    22% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2036

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2624%
Q4 2025-2632%
Q1 2026-2735%
Q2 2026-2743%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 145%
Tower-0242%
Tower-339%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

450 booked414 leftQ2 2026-27

Still available: 147 × 1BHK, 124 × 3.5BHK, 143 × 3BHK.

Booked, by type

1BHK0 of 147
3.5BHK188 of 312
3BHK262 of 405

Booked, each quarter

Q3 2025-26356 of 864
Q4 2025-26389 of 864
Q1 2026-27464 of 864
Q2 2026-27450 of 864

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK
1,030 sq ft
96 m² carpet · sizes 953–1,313 sq ft (150 at this size)
44 m² land share · 13 m² balcony/terrace · 1 parking space
405 homes · 47% of the project
3.5BHK
1,310 sq ft
122 m² carpet · sizes 1,180–1,313 sq ft (138 at this size)
58 m² land share · 20 m² balcony/terrace · 2 parking spaces
312 homes · 36% of the project
1BHK
226 sq ft
21 m² carpet
9 m² land share · 6 m² balcony/terrace · 1 parking space
147 homes · 17% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 134 floors
Tower-0234 floors
Tower-334 floors

Tower 1: 288 homes, 3 basements · Tower-02: 288 homes, 3 basements · Tower-3: 288 homes, 3 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project44
Typical within 3 km (50)76
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project94%
Typical within 3 km (51)75%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
15.44 acres

62,473 m²

Ground covered by buildings
6% of the land

3,537 m²

Floor-area ratio
3.00

Floors built per unit of land: 3.00 m² of floors for each m² of land.

Parking
1.10 per home

687 covered, 61 open

Built-up area, all floors
14,34,763 sq ft

1,33,294 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 5 RERA projects of NEOBUILD VENTURES LLP on the map

Complaints to RERA about its other projects

The company

Registered as
NEOBUILD VENTURES LLP
Type
Partnership Firm
Company number
ACA-3481

CIN or LLPIN, from the Registrar of Companies.

PAN
AAVFN0923E
GSTIN
29AAVFN0923E1Z2

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including M/s. Skanda Avani Shelters Pvt Ltd, Represented by Ramanolla Sandeep.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹34.6 crBuilding and development ₹610.0 crTotal ₹644.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹47.5 cr₹18.5 cr
Q4 2025-26₹74.1 cr₹69.7 cr
Q1 2026-27₹28.9 cr₹24.6 cr
Q2 2026-27₹119.5 cr₹83.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.92 kmReliable
  • Nearest railway station4.43 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.15 kmCaveat

Hospitals

  • Nearest hospital2.03 kmCaveat

Schools

  • Schools in pincode 560087 (UDISE+ census)55Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.52 kmReliable
  • Nearest sewage treatment plant5.55 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)8.86 kmCaveat
  • Nearest commercial-airport runway32.21 kmReliable
  • Distance to runway approach-path proxy31.1 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (12.89857, 77.74565), 2026-10-24. Each figure's source and caveat are in the full report.