Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

THE PEARL PARADISE

by SRI SAI INFRA PROJECTS · 32 homes · 0.47 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Dec 2026. 90% built with 87% of the time used. 72% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
90% built

Due 31 Dec 2026. 87% of the time from RERA approval to the deadline has passed.

Built90%
Time used87%
How much is sold?9 left
72% booked

23 of 32 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
68 homes per acre

Similar projects within 3 km: 69 per acre. 53% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started9 May 2025
  2. Approved by RERA23 Jul 2025
  3. Today24 Oct 2026

    87% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2675%
Q4 2025-2640%
Q1 2026-2787%
Q2 2026-2790%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

23 booked9 leftQ2 2026-27

Still available: 3 × 2 BHK, 6 × 3 BHK.

Booked, by type

2 BHK13 of 16
3 BHK10 of 16

Booked, each quarter

Q3 2025-263 of 32
Q4 2025-265 of 32
Q1 2026-2713 of 32
Q2 2026-2723 of 32

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
920 sq ft
86 m² carpet · sizes 920–981 sq ft (4 at this size)
65 m² land share · 30 m² balcony/terrace · 1 parking space
16 homes · 50% of the project
2 BHK
815 sq ft
76 m² carpet · sizes 723–815 sq ft (8 at this size)
52 m² land share · 24 m² balcony/terrace · 1 parking space
16 homes · 50% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

The Pearl Paradise5 floors

The Pearl Paradise: 32 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (69)69
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project53%
Typical within 3 km (71)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.47 acres

1,903 m²

Ground covered by buildings
47% of the land

901 m²

Floor-area ratio
1.75

Floors built per unit of land: 1.75 m² of floors for each m² of land.

Parking
1.19 per home

38 covered, 0 open

Built-up area, all floors
42,431 sq ft

3,942 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
SRI SAI INFRA PROJECTS
Type
Partnership Firm
PAN
AFCFS8194J
GSTIN
29AFCFS8194J1Z8

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹6.6 crBuilding and development ₹12.9 crTotal ₹16.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹74.7 lakh₹49.9 lakh
Q4 2025-26₹2.0 cr₹1.5 cr
Q1 2026-27₹5.2 cr₹4.6 cr
Q2 2026-27₹4.5 cr₹3.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.06 kmReliable
  • Nearest railway station6.53 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)1.46 kmCaveat

Hospitals

  • Nearest hospital1.85 kmCaveat

Schools

  • Schools in pincode 560077 (UDISE+ census)123Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKothanur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.86 kmReliable
  • Nearest sewage treatment plant2.96 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)6.51 kmCaveat
  • Nearest commercial-airport runway13.5 kmReliable
  • Distance to runway approach-path proxy12.18 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.07094, 77.66104), 2026-10-24. Each figure's source and caveat are in the full report.