Upcoming Under construction, due Jun 2029. 35% built with 12% of the time used. 100% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
35% built

Due 10 Jun 2029. 12% of the time from RERA approval to the deadline has passed.

Built35%
Time used12%
How much is sold?0 left
100% booked

56 of 56 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
75 homes per acre

Similar projects within 3 km: 81 per acre. 32% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA10 Jun 2026
  2. Work started10 Jun 2026
  3. Today24 Oct 2026

    12% of the time to the deadline has passed.

  4. If it slips like a typical project12 Mar 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q1 2026-2729%
Q2 2026-2735%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

56 booked0 leftQ2 2026-27

Booked, by type

2 BHK16 of 16
3 BHK40 of 40

Booked, each quarter

Q1 2026-2732 of 56
Q2 2026-2756 of 56

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
907 sq ft
84 m² carpet · sizes 907–1,192 sq ft (4 at this size)
61 m² land share · 20 m² balcony/terrace · 1 parking space
40 homes · 71% of the project
2 BHK
739 sq ft
69 m² carpet · sizes 739–799 sq ft (4 at this size)
43 m² land share · 16 m² balcony/terrace · 1 parking space
16 homes · 29% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A3 floors

Block A: 56 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project75
Typical within 3 km (52)81
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project32%
Typical within 3 km (53)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.75 acres

3,035 m²

Ground covered by buildings
69% of the land

2,079 m²

Floor-area ratio
2.21

Floors built per unit of land: 2.21 m² of floors for each m² of land.

Parking
1.12 per home

63 covered, 0 open

Built-up area, all floors
98,414 sq ft

9,143 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of AMBERSTONE PROPERTIES on the map

The company

Registered as
AMBERSTONE PROPERTIES PRIVATE LIMITED
Type
Company
Company number
U43299KA2025PTC211410

CIN or LLPIN, from the Registrar of Companies.

PAN
ABECA2067P
GSTIN
29ABECA2067P1Z6

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹14.5 crBuilding and development ₹37.5 crTotal ₹52.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q1 2026-27₹2.7 cr₹2.7 cr
Q2 2026-27₹22.1 cr₹22.1 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.42 kmReliable
  • Nearest railway station10.78 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.87 kmCaveat

Hospitals

  • Nearest hospital2.27 kmCaveat

Schools

  • Schools in pincode 560062 (UDISE+ census)66Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km21.7 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionThalaghattapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well10.8 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.16 kmReliable
  • Nearest sewage treatment plant3.72 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)14.24 kmCaveat
  • Nearest commercial-airport runway39.5 kmReliable
  • Distance to runway approach-path proxy36.1 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.85396, 77.56528), 2026-10-24. Each figure's source and caveat are in the full report.