by M/S. GLOBAL EDIFICE INFRA · 258 homes · 3.29 acres · 1 tower · Anekal

Upcoming Under construction, due Dec 2028. 41% built with 32% of the time used. 15% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
41% built

Due 31 Dec 2028. 32% of the time from RERA approval to the deadline has passed.

Built41%
Time used32%
How much is sold?220 left
15% booked

38 of 258 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
78 homes per acre

Similar projects within 3 km: 69 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 4 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started4 Jul 2025
  2. Approved by RERA9 Oct 2025
  3. Today24 Oct 2026

    32% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2615%
Q4 2025-2624%
Q1 2026-2730%
Q2 2026-2741%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

38 booked220 leftQ2 2026-27

Still available: 49 × 2 BHK, 10 × 2.5 BHK, 161 × 3 BHK.

Booked, by type

2 BHK9 of 58
2.5 BHK0 of 10
3 BHK29 of 190

Booked, each quarter

Q3 2025-267 of 258
Q4 2025-2612 of 258
Q1 2026-2718 of 258
Q2 2026-2738 of 258

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
889 sq ft
83 m² carpet · sizes 804–1,110 sq ft (56 at this size)
38 m² land share · 14 m² balcony/terrace · 1 parking space
190 homes · 74% of the project
2 BHK
788 sq ft
73 m² carpet · sizes 727–887 sq ft (24 at this size)
34 m² land share · 14 m² balcony/terrace · 1 parking space
58 homes · 22% of the project
2.5 BHK
954 sq ft
89 m² carpet · sizes 925–954 sq ft (8 at this size)
40 m² land share · 14 m² balcony/terrace · 1 parking space
10 homes · 4% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower-19 floors

Tower-1: 258 homes, 30 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project78
Typical within 3 km (42)69
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (42)65%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.29 acres

13,304 m²

Ground covered by buildings
50% of the land

6,683 m²

Floor-area ratio
2.49

Floors built per unit of land: 2.49 m² of floors for each m² of land.

Parking
1.11 per home

286 covered, 0 open

Built-up area, all floors
2,92,832 sq ft

27,205 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 4 RERA projects of GLOBAL EDIFICE INFRA on the map

Complaints to RERA about its other projects

The company

Registered as
M/S. GLOBAL EDIFICE INFRA
Type
Partnership Firm
PAN
AAWFG9665R
GSTIN
29AAWFG9665R1ZS
Website
www.globaledifice.in

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹28.9 crBuilding and development ₹120.4 crTotal ₹149.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹72.2 lakh₹72.2 lakh
Q4 2025-26₹1.5 cr₹1.2 cr
Q1 2026-27₹2.0 cr₹2.3 cr
Q2 2026-27₹6.4 cr₹5.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station12.62 kmReliable
  • Nearest railway station10.63 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.02 kmCaveat

Hospitals

  • Nearest hospital0.91 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)16.7 kmReliable
  • Nearest sewage treatment plant6.63 kmCaveat
  • Industrial zones within 1 km4Caveat
  • Nearest airfield runway (any, incl. military)15.17 kmCaveat
  • Nearest commercial-airport runway37.43 kmReliable
  • Distance to runway approach-path proxy35.07 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.85797, 77.79783), 2026-10-24. Each figure's source and caveat are in the full report.