RERA project · Residential/Group Housing

THARUNS B V SATTVA

by BV BUILDERS · 80 homes · 0.90 acres · 2 towers · Bengaluru East

Delivered on time Completed: the builder filed for completion on 15 May 2026, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 15 May 2026, by the date it promised.

How much is sold?0 left
100% booked

80 of 80 homes, as the builder reported for Q3 2025-26.

How crowded is it?More crowded
89 homes per acre

Similar projects within 3 km: 73 per acre. 46% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started15 Sep 2022
  2. Approved by RERA24 Mar 2023
  3. Completion filed15 May 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-26100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q3 2025-26

Block A100%
Block B100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

80 booked0 leftQ3 2025-26

Booked, by type

2 BHK69 of 69
3 BHK11 of 11

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
870 sq ft
81 m² carpet · sizes 406–1,076 sq ft (4 at this size)
46 m² land share · 10 m² balcony/terrace · 1 parking space
69 homes · 86% of the project
3 BHK
1,091 sq ft
101 m² carpet · sizes 1,060–1,178 sq ft (5 at this size)
50 m² land share · 11 m² balcony/terrace · 1 parking space
11 homes · 14% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A4 floors
Block B4 floors

Block A: 56 homes, 11 m tall, 1 basement · Block B: 24 homes, 13 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project89
Typical within 3 km (33)73
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project46%
Typical within 3 km (33)50%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.90 acres

3,630 m²

Ground covered by buildings
54% of the land

1,967 m²

Floor-area ratio
1.88

Floors built per unit of land: 1.88 m² of floors for each m² of land.

Parking
1.10 per home

88 covered, 0 open

Built-up area, all floors
1,08,102 sq ft

10,043 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
BV BUILDERS
Type
Partnership Firm
PAN
AAYFB6778Q
GSTIN
29AAYFB6778Q1ZX

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹8.5 crBuilding and development ₹20.5 crTotal ₹29.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹5.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station12.18 kmReliable
  • Nearest railway station3.39 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.52 kmCaveat

Hospitals

  • Nearest hospital1.01 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionYelahanka New Town PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km7Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.51 kmReliable
  • Nearest sewage treatment plant0.92 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)1.52 kmCaveat
  • Nearest commercial-airport runway13.48 kmReliable
  • Distance to runway approach-path proxy6.21 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.13330, 77.57978), 2026-10-24. Each figure's source and caveat are in the full report.