Upcoming Under construction, due Dec 2030. 40% built with 30% of the time used. 79% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
40% built

Due 31 Dec 2030. 30% of the time from RERA approval to the deadline has passed.

Built40%
Time used30%
How much is sold?16 left
79% booked

62 of 78 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
15 homes per acre

Similar projects within 3 km: 70 per acre. 0% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started25 Nov 2024
  2. Approved by RERA2 Jan 2025
  3. Today24 Oct 2026

    30% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2628%
Q4 2025-2630%
Q1 2026-2735%
Q2 2026-2740%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 550%
Block 650%
Block 720%
Block 850%
Block 915%
Block 100%
Block 110%
Block 1218%
Block 1310%
Block 145%
Block 155%
Block 1610%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

62 booked16 leftQ2 2026-27

Still available: 12 × 4 BHK, 4 × 5 BHK.

Booked, by type

4 BHK55 of 67
5 BHK7 of 11

Booked, each quarter

Q3 2025-2627 of 78
Q4 2025-2643 of 78
Q1 2026-2757 of 78
Q2 2026-2762 of 78

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4 BHK
2,213 sq ft
206 m² carpet · sizes 2,213–2,404 sq ft (28 at this size)
255 m² land share · 6 m² balcony/terrace · 2 parking spaces
67 homes · 86% of the project
5 BHK
2,799 sq ft
260 m² carpet · sizes 2,774–2,799 sq ft (9 at this size)
304 m² land share · 7 m² balcony/terrace · 2 parking spaces
11 homes · 14% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 53 floors
Block 63 floors
Block 73 floors
Block 83 floors
Block 93 floors
Block 104 floors
Block 113 floors
Block 123 floors
Block 133 floors
Block 143 floors
Block 153 floors
Block 164 floors

Block 5: 6 homes, 11 m tall · Block 6: 6 homes, 11 m tall · Block 7: 5 homes, 11 m tall · Block 8: 5 homes, 11 m tall · Block 9: 5 homes, 11 m tall · Block 10: 2 homes, 14 m tall · Block 11: 7 homes, 11 m tall · Block 12: 17 homes, 11 m tall · Block 13: 9 homes, 11 m tall · Block 14: 4 homes, 11 m tall · Block 15: 3 homes, 11 m tall · Block 16: 9 homes, 14 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project15
Typical within 3 km (9)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project0%
Typical within 3 km (9)63%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.32 acres

21,549 m²

Ground covered by buildings
0% of the land

0 m²

Floor-area ratio
1.00

Floors built per unit of land: 1.00 m² of floors for each m² of land.

Parking
2.00 per home

156 covered, 0 open

Built-up area, all floors
2,21,446 sq ft

20,573 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of SURYA DEVELOPERS on the map

The company

Registered as
SURYA DEVELOPERS
Type
Partnership Firm
PAN
ACQFS1381N
GSTIN
29ACQFS1381N1Z9

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹15.9 crBuilding and development ₹90.0 crTotal ₹142.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹5.7 cr₹5.5 cr
Q4 2025-26₹14.8 cr₹9.9 cr
Q1 2026-27₹15.3 cr₹16.0 cr
Q2 2026-27₹45.4 cr₹45.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station17.49 kmReliable
  • Nearest railway station3.24 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.22 kmCaveat

Hospitals

  • Nearest hospital3.13 kmCaveat

Schools

  • Schools in pincode 562157 (UDISE+ census)56Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionRajanukunte PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km4Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.69 kmReliable
  • Nearest sewage treatment plant8.85 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)8.48 kmCaveat
  • Nearest commercial-airport runway14.91 kmReliable
  • Distance to runway approach-path proxy6.86 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.19899, 77.54895), 2026-10-24. Each figure's source and caveat are in the full report.