Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SURYA VALENCIA Phase I

by SURYA DEVELOPERS · 44 homes · 3.65 acres · 5 towers · Yelahanka

Upcoming Under construction, due Dec 2028. 68% built with 46% of the time used. 75% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
68% built

Due 31 Dec 2028. 46% of the time from RERA approval to the deadline has passed.

Built68%
Time used46%
How much is sold?11 left
75% booked

33 of 44 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
12 homes per acre

Similar projects within 3 km: 70 per acre. 0% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started8 Nov 2024
  2. Approved by RERA17 Dec 2024
  3. Today24 Oct 2026

    46% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2628%
Q4 2025-2641%
Q1 2026-2748%
Q2 2026-2768%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 15%
Block 2 Part A40%
Block 2 Part B40%
Block 385%
Block 465%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

33 booked11 leftQ2 2026-27

Still available: 7 × 5 BHK, 4 × 4 BHK.

Booked, by type

5 BHK25 of 32
4 BHK8 of 12

Booked, each quarter

Q3 2025-2621 of 44
Q4 2025-2624 of 44
Q1 2026-2728 of 44
Q2 2026-2733 of 44

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

5 BHK
  • 2,799 sq ft24 homes260.0 m²
  • 2,777 sq ft4 homes258.0 m²
  • 2,821 sq ft3 homes262.1 m²
  • 2,761 sq ft1 home256.5 m²
Typically 304 m² land share · 7 m² balcony/terrace · 2 parking spaces
32 homes · 73% of the project
4 BHK
  • 2,404 sq ft7 homes223.3 m²
  • 2,213 sq ft5 homes205.6 m²
Typically 262 m² land share · 6 m² balcony/terrace · 2 parking spaces
12 homes · 27% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 14 floors
Block 2 Part A4 floors
Block 2 Part B3 floors
Block 33 floors
Block 44 floors

Block 1: 4 homes, 14 m tall · Block 2 Part A: 4 homes, 14 m tall · Block 2 Part B: 5 homes, 11 m tall · Block 3: 7 homes, 11 m tall · Block 4: 24 homes, 14 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project12
Typical within 3 km (9)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project0%
Typical within 3 km (9)63%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.65 acres

14,770 m²

Ground covered by buildings
0% of the land

0 m²

Floor-area ratio
1.00

Floors built per unit of land: 1.00 m² of floors for each m² of land.

Parking
2.00 per home

88 covered, 0 open

Built-up area, all floors
1,39,694 sq ft

12,978 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of SURYA DEVELOPERS on the map

The company

Registered as
SURYA DEVELOPERS
Type
Partnership Firm
PAN
ACQFS1381N
GSTIN
29ACQFS1381N1Z9

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹10.1 crBuilding and development ₹42.5 crTotal ₹65.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹8.2 cr₹7.5 cr
Q4 2025-26₹14.6 cr₹10.4 cr
Q1 2026-27₹2.4 cr₹2.8 cr
Q2 2026-27₹34.3 cr₹29.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station17.49 kmReliable
  • Nearest railway station3.24 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.22 kmCaveat

Hospitals

  • Nearest hospital3.13 kmCaveat

Schools

  • Schools in pincode 562157 (UDISE+ census)56Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionRajanukunte PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km4Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.69 kmReliable
  • Nearest sewage treatment plant8.85 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)8.48 kmCaveat
  • Nearest commercial-airport runway14.91 kmReliable
  • Distance to runway approach-path proxy6.86 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.19899, 77.54895), 2026-10-24. Each figure's source and caveat are in the full report.