Delivered late Completed: the builder filed for completion on 3 Aug 2023, 307 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 3 Aug 2023, 307 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
88 homes per acre

Similar projects within 3 km: 82 per acre. 78% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 4 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?12 due so far
17% on time

Of its 27 RERA projects in Bengaluru Urban: 2 delivered on time, 10 late (after the date first promised), 15 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started5 Nov 2019
  2. Approved by RERA3 Jan 2020
  3. First promised30 Sep 2022

    The date the builder gave at registration.

  4. Completion filed3 Aug 2023

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2 BHK
  • 860 sq ft56 homes79.9 m²
  • 885 sq ft42 homes82.2 m²
Typically 41 m² land share · 8 m² balcony/terrace · 1 parking space
98 homes · 70% of the project
3 BHK
  • 1,238 sq ft14 homes115.0 m²
Typically 57 m² land share · 9 m² balcony/terrace · 1 parking space
14 homes · 10% of the project
2.5 BHK
  • 1,085 sq ft13 homes100.8 m²
  • 1,090 sq ft1 home101.3 m²
Typically 51 m² land share · 8 m² balcony/terrace · 1 parking space
14 homes · 10% of the project
3.5 BHK
  • 1,340 sq ft13 homes124.5 m²
  • 1,390 sq ft1 home129.1 m²
Typically 65 m² land share · 15 m² balcony/terrace · 1 parking space
14 homes · 10% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing-A14 floors

Wing-A: 140 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project88
Typical within 3 km (56)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project78%
Typical within 3 km (57)51%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.59 acres

6,424 m²

Ground covered by buildings
21% of the land

1,380 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 27 RERA projects of Sumadhura on the map

Complaints to RERA about its other projects

The company

Registered as
SUMADHURA INFRACON PRIVATE LIMITED
Type
Company
Company number
U45200KA2012PTC062071

CIN or LLPIN, from the Registrar of Companies.

PAN
AAQCS9641A

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹3.0 cr
Construction
₹65.5 cr
Total project cost
₹68.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.28 kmReliable
  • Nearest railway station4.13 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)0.81 kmCaveat

Hospitals

  • Nearest hospital0.63 kmCaveat

Schools

  • Schools in pincode 560048 (UDISE+ census)39Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km12Caveat
  • Median pupil-teacher ratio, schools within 1 km30 :1Caveat
  • Schools with library + playground + ICT lab (1 km)9Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionMahadevapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.21 kmReliable
  • Nearest sewage treatment plant1.58 kmCaveat
  • Industrial zones within 1 km20Caveat
  • Nearest airfield runway (any, incl. military)5.33 kmCaveat
  • Nearest commercial-airport runway21.93 kmReliable
  • Distance to runway approach-path proxy21.43 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.99114, 77.71230), 2026-10-24. Each figure's source and caveat are in the full report.