Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SUMADHURA SOHAM PHASE II

by SUMADHURA INFRACON PRIVATE LIMITED · 40 homes · 0.63 acres · 2 towers · Bengaluru East

Delivered late Completed: the builder filed for completion on 19 Mar 2022, 901 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 19 Mar 2022, 901 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
63 homes per acre

Similar projects within 3 km: 52 per acre. 51% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 4 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?12 due so far
17% on time

Of its 27 RERA projects in Bengaluru Urban: 2 delivered on time, 10 late (after the date first promised), 15 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Oct 2018
  2. Approved by RERA23 Apr 2019
  3. Completion filed19 Mar 2022

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

NA
1,087 sq ft
101 m² carpet · sizes 1,079–1,474 sq ft (8 at this size)
54 m² land share · 6 m² balcony/terrace · 1 parking space
23 homes · 58% of the project
3BHK
1,196 sq ft
111 m² carpet · sizes 1,163–1,196 sq ft (5 at this size)
53 m² land share · 7 m² balcony/terrace · 1 parking space
17 homes · 42% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing A4 floors
Wing P4 floors

Wing A: 20 homes, 1 basement · Wing P: 20 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project63
Typical within 3 km (22)52
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project51%
Typical within 3 km (22)39%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.63 acres

2,554 m²

Ground covered by buildings
49% of the land

1,260 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 27 RERA projects of Sumadhura on the map

Complaints to RERA about its other projects

The company

Registered as
SUMADHURA INFRACON PRIVATE LIMITED
Type
Company
Company number
U45200KA2012PTC062071

CIN or LLPIN, from the Registrar of Companies.

PAN
AAQCS9641A

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹5.3 cr
Construction
₹27.6 cr
Total project cost
₹32.9 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.11 kmReliable
  • Nearest railway station1.94 kmReliable
  • Bus stops within 500 m12Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km7Caveat
  • Parks within 1 km17Caveat
  • Nearest lake / water body (≥2 ha)0.57 kmCaveat

Hospitals

  • Nearest hospital0.08 kmCaveat

Schools

  • Schools in pincode 560038 (UDISE+ census)25Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km10Caveat
  • Median pupil-teacher ratio, schools within 1 km15.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionIndiranagar PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)33 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km3Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well17.8 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.31 kmReliable
  • Nearest sewage treatment plant1.36 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)3.77 kmCaveat
  • Nearest commercial-airport runway23.92 kmReliable
  • Distance to runway approach-path proxy21.96 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (12.97930, 77.63856), 2026-10-24. Each figure's source and caveat are in the full report.