Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Sumadhura Elysium Phase-I

by SUMADHURA BUILDWELL PRIVATE LIMITED · 319 homes · 5.18 acres · 3 towers · Bengaluru East

Upcoming Under construction, due Dec 2029. 36% built with 12% of the time used. 0% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
36% built

Due 31 Dec 2029. 12% of the time from RERA approval to the deadline has passed.

Built36%
Time used12%
How much is sold?319 left
0% booked

0 of 319 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
62 homes per acre

Similar projects within 3 km: 80 per acre. 85% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?12 due so far
17% on time

Of its 27 RERA projects in Bengaluru Urban: 2 delivered on time, 10 late (after the date first promised), 15 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Apr 2026
  2. Approved by RERA22 May 2026
  3. Today24 Oct 2026

    12% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q1 2026-2731%
Q2 2026-2736%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Lyra (Wing-E)0%
Lyra (Wing-F)0%
Lyra (Wing-G)0%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

0 booked319 leftQ2 2026-27

Still available: 36 × Elite 3 BHK, 76 × Elite 4 BHK, 150 × Regal 3 BHK, 57 × Regal 4 BHK.

Booked, by type

Elite 3 BHK0 of 36
Elite 4 BHK0 of 76
Regal 3 BHK0 of 150
Regal 4 BHK0 of 57

Booked, each quarter

Q1 2026-270 of 319
Q2 2026-270 of 319

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

Regal 3 BHK
1,263 sq ft
117 m² carpet · sizes 1,220–1,321 sq ft (74 at this size)
42 m² land share · 25 m² balcony/terrace · 2 parking spaces
150 homes · 47% of the project
Elite 4 BHK
1,462 sq ft
136 m² carpet · sizes 1,461–1,479 sq ft (38 at this size)
48 m² land share · 26 m² balcony/terrace · 2 parking spaces
76 homes · 24% of the project
Regal 4 BHK
1,820 sq ft
169 m² carpet
58 m² land share · 29 m² balcony/terrace · 2 parking spaces
57 homes · 18% of the project
Elite 3 BHK
1,197 sq ft
111 m² carpet
38 m² land share · 19 m² balcony/terrace · 2 parking spaces
36 homes · 11% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Lyra (Wing-E)18 floors
Lyra (Wing-F)18 floors
Lyra (Wing-G)18 floors

Lyra (Wing-E): 112 homes, 58 m tall, 2 basements · Lyra (Wing-F): 114 homes, 58 m tall, 2 basements · Lyra (Wing-G): 93 homes, 58 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project62
Typical within 3 km (127)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project85%
Typical within 3 km (127)74%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.18 acres

20,957 m²

Ground covered by buildings
15% of the land

3,161 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
2.03 per home

638 covered, 10 open

Built-up area, all floors
6,42,131 sq ft

59,656 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 27 RERA projects of Sumadhura on the map

The company

Registered as
SUMADHURA BUILDWELL PRIVATE LIMITED
Type
Company
Company number
U41001KA2023PTC177166

CIN or LLPIN, from the Registrar of Companies.

PAN
ABLCS4471L
GSTIN
29ABLCS4471L1ZL

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹119.0 crBuilding and development ₹455.7 crTotal ₹574.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q1 2026-27₹0.0 lakh₹0.0 lakh
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.42 kmReliable
  • Nearest railway station2.44 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)0.65 kmCaveat

Hospitals

  • Nearest hospital1.15 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)0Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.75 kmReliable
  • Nearest sewage treatment plant1.38 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)3.89 kmCaveat
  • Nearest commercial-airport runway28.83 kmReliable
  • Distance to runway approach-path proxy28.28 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)6Caveat

ReliableFrom our location report at the builder-entered pin (12.92872, 77.71169), 2026-10-24. Each figure's source and caveat are in the full report.