Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SRINIS URBANE

by Srinivasa Constructions · 112 homes · 1.38 acres · 2 towers · Anekal

Delivered on time Completed: the builder filed for completion on 30 Dec 2025, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 30 Dec 2025, by the date it promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
81 homes per acre

Similar projects within 3 km: 71 per acre. 47% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
100% on time

Of its 2 RERA projects in Bengaluru Urban: 1 delivered on time, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started14 Jan 2022
  2. Approved by RERA8 Sep 2022
  3. Completion filed30 Dec 2025

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2 BHK
  • 69 sq ft40 homes6.4 m²
  • 64 sq ft16 homes5.9 m²
  • 62 sq ft8 homes5.8 m²
Typically 4 m² land share · 1 m² balcony/terrace · 1 parking space
64 homes · 57% of the project
3 BHK
  • 84 sq ft16 homes7.8 m²
  • 86 sq ft8 homes8.0 m²
  • 88 sq ft8 homes8.2 m²
  • 91 sq ft8 homes8.5 m²
  • and 8 homes in other sizes
Typically 5 m² land share · 1 m² balcony/terrace · 1 parking space
48 homes · 43% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder listed the areas in sq ft; m² figures are converted.

Towers

Block A4 floors
Tower B3 floors

Block A: 56 homes, 15 m tall · Tower B: 56 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project81
Typical within 3 km (72)71
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project47%
Typical within 3 km (74)66%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.38 acres

5,588 m²

Ground covered by buildings
53% of the land

2,943 m²

Floor-area ratio
1.99

Floors built per unit of land: 1.99 m² of floors for each m² of land.

Parking
1.12 per home

112 covered, 13 open

Built-up area, all floors
1,54,763 sq ft

14,378 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Srinivasa Constructions on the map

The company

Registered as
Srinivasa Constructions
Type
Partnership Firm
PAN
ADXFS2877H
GSTIN
29ADXFS2877H1Z2
Website
srinivasaconstructions.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development), including SRINIVASA CONSTRUCTIONS Represented by its Authroised Signatory Mr. G Dhanjaya Naidu.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹5.0 crBuilding and development ₹34.2 crTotal ₹39.2 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.47 kmReliable
  • Nearest railway station7.04 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)0.89 kmCaveat

Hospitals

  • Nearest hospital2.23 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)13.04 kmReliable
  • Nearest sewage treatment plant7.72 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)11.26 kmCaveat
  • Nearest commercial-airport runway33.15 kmReliable
  • Distance to runway approach-path proxy31.45 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.89236, 77.76889), 2026-10-24. Each figure's source and caveat are in the full report.