Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SRINIS PRISTINE

by SRINIVASA CONSTRUCTIONS · 76 homes · 1.00 acres · 1 tower · Anekal

Upcoming Under construction, due Dec 2028. 74% built with 34% of the time used. 21% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
74% built

Due 31 Dec 2028. 34% of the time from RERA approval to the deadline has passed.

Built74%
Time used34%
How much is sold?60 left
21% booked

16 of 76 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
76 homes per acre

Similar projects within 3 km: 70 per acre. 40% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
100% on time

Of its 2 RERA projects in Bengaluru Urban: 1 delivered on time, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started20 Mar 2025
  2. Approved by RERA4 Sep 2025
  3. Today24 Oct 2026

    34% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2646%
Q4 2025-2660%
Q1 2026-2766%
Q2 2026-2774%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

16 booked60 leftQ2 2026-27

Still available: 10 × 2 BHK, 50 × 3 BHK.

Booked, by type

2 BHK10 of 20
3 BHK6 of 56

Booked, each quarter

Q3 2025-267 of 76
Q4 2025-2611 of 76
Q1 2026-2711 of 76
Q2 2026-2716 of 76

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 863 sq ft4 homes80.2 m²
  • 902 sq ft4 homes83.8 m²
  • 925 sq ft4 homes85.9 m²
  • 936 sq ft4 homes87.0 m²
  • and 40 homes in other sizes
Typically 56 m² land share · 21 m² balcony/terrace · 1 parking space
56 homes · 74% of the project
2 BHK
  • 772 sq ft8 homes71.7 m²
  • 648 sq ft4 homes60.2 m²
  • 745 sq ft4 homes69.2 m²
  • 791 sq ft4 homes73.5 m²
Typically 44 m² land share · 16 m² balcony/terrace · 1 parking space
20 homes · 26% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A3 floors

A: 76 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project76
Typical within 3 km (97)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project40%
Typical within 3 km (99)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.00 acres

4,047 m²

Ground covered by buildings
59% of the land

2,406 m²

Floor-area ratio
2.00

Floors built per unit of land: 2.00 m² of floors for each m² of land.

Parking
2.24 per home

85 covered, 85 open

Built-up area, all floors
1,16,573 sq ft

10,830 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Srinivasa Constructions on the map

The company

Registered as
SRINIVASA CONSTRUCTIONS
Type
Partnership Firm
PAN
ADXFS2877H
GSTIN
29ADXFS2877H1Z2
Website
www.srinivasaconstructions.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹10.9 crBuilding and development ₹39.1 crTotal ₹50.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹44.5 lakh₹5.9 cr
Q4 2025-26₹1.3 cr₹7.0 cr
Q1 2026-27₹3.8 cr₹3.2 cr
Q2 2026-27₹3.4 cr₹3.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.75 kmReliable
  • Nearest railway station7.06 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.61 kmCaveat

Hospitals

  • Nearest hospital1.56 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)12.8 kmReliable
  • Nearest sewage treatment plant7.44 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)11.66 kmCaveat
  • Nearest commercial-airport runway34.15 kmReliable
  • Distance to runway approach-path proxy32.54 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.88283, 77.76595), 2026-10-24. Each figure's source and caveat are in the full report.