Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SRINIDHI-THE URBAN SUITES

by SRINIDHI DESIGNBUILD PRIVATE LIMITED · 107 homes · 1.75 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Mar 2027. 80% built with 85% of the time used. 51% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
80% built

Due 31 Mar 2027. 85% of the time from RERA approval to the deadline has passed.

Built80%
Time used85%
How much is sold?52 left
51% booked

55 of 107 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
61 homes per acre

Similar projects within 3 km: 69 per acre. 58% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started8 Feb 2024
  2. Approved by RERA4 May 2024
  3. Today24 Oct 2026

    85% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2651%
Q4 2025-2660%
Q1 2026-2769%
Q2 2026-2780%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

55 booked52 leftQ2 2026-27

Still available: 11 × 2 BHK, 41 × 3 BHK.

Booked, by type

2 BHK25 of 36
3 BHK30 of 71

Booked, each quarter

Q3 2025-2651 of 107
Q4 2025-2653 of 107
Q1 2026-2753 of 107
Q2 2026-2755 of 107

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 974 sq ft21 homes90.5 m²
  • 973 sq ft12 homes90.4 m²
  • 950 sq ft7 homes88.3 m²
  • 869 sq ft4 homes80.7 m²
  • and 27 homes in other sizes
Typically 58 m² land share · 9 m² balcony/terrace · 1 parking space
71 homes · 66% of the project
2 BHK
  • 813 sq ft12 homes75.5 m²
  • 834 sq ft12 homes77.5 m²
  • 814 sq ft4 homes75.6 m²
  • 835 sq ft4 homes77.6 m²
  • and 4 homes in other sizes
Typically 48 m² land share · 7 m² balcony/terrace · 1 parking space
36 homes · 34% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

The Urban Suites3 floors

The Urban Suites: 107 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project61
Typical within 3 km (10)69
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project58%
Typical within 3 km (10)47%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.75 acres

7,081 m²

Ground covered by buildings
42% of the land

2,948 m²

Floor-area ratio
1.75

Floors built per unit of land: 1.75 m² of floors for each m² of land.

Parking
1.11 per home

116 covered, 2 open

Built-up area, all floors
1,78,390 sq ft

16,573 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
SRINIDHI DESIGNBUILD PRIVATE LIMITED
Type
Company
Company number
U45205KA2012PTC066799

CIN or LLPIN, from the Registrar of Companies.

PAN
AASCS2838P
GSTIN
29AASCS2838P3Z7

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹34.0 crBuilding and development ₹45.3 crTotal ₹79.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹7.4 cr₹7.9 cr
Q4 2025-26₹2.6 cr₹4.9 cr
Q1 2026-27₹6.2 cr₹5.1 cr
Q2 2026-27₹3.2 cr₹6.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.85 kmReliable
  • Nearest railway station3.08 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km7Caveat
  • Parks within 1 km7Caveat
  • Nearest lake / water body (≥2 ha)0.73 kmCaveat

Hospitals

  • Nearest hospital0.53 kmCaveat

Schools

  • Schools in pincode 560017 (UDISE+ census)25Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km18Caveat
  • Median pupil-teacher ratio, schools within 1 km25.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)10Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionH.A.L. PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.66 kmReliable
  • Nearest sewage treatment plant0.79 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)2.26 kmCaveat
  • Nearest commercial-airport runway24.27 kmReliable
  • Distance to runway approach-path proxy23.29 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (12.97088, 77.67114), 2026-10-24. Each figure's source and caveat are in the full report.