Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SRI SAI SAROVAR

by SRI SAI CONSTRUCTIONS · 124 homes · 1.80 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Dec 2026, after an extension. 98% built with 95% of the time used. 76% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
98% built

Due 31 Dec 2026. 95% of the time from RERA approval to the deadline has passed.

Built98%
Time used95%
How much is sold?37 left
76% booked

118 of 155 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
69 homes per acre

Similar projects within 3 km: 81 per acre. 58% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started29 Nov 2022
  2. Approved by RERA10 Apr 2023
  3. First promised31 Dec 2025

    The date the builder gave at registration.

  4. Today24 Oct 2026

    95% of the time to the deadline has passed.

  5. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2689%
Q4 2025-2694%
Q1 2026-2797%
Q2 2026-2798%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

118 booked37 leftQ2 2026-27

Still available: 31 × 2 BHK, 6 × 3 BHK.

Booked, by type

2 BHK74 of 105
3 BHK44 of 50

Booked, each quarter

Q3 2025-2689 of 155
Q4 2025-2696 of 155
Q1 2026-27100 of 155
Q2 2026-27118 of 155

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
875 sq ft
81 m² carpet · sizes 787–903 sq ft (35 at this size)
44 m² land share · 24 m² balcony/terrace · 1 parking space
105 homes · 68% of the project
3 BHK
954 sq ft
89 m² carpet · sizes 954–1,151 sq ft (5 at this size)
54 m² land share · 29 m² balcony/terrace · 1 parking space
50 homes · 32% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Sri Sai Sarovar5 floors

Sri Sai Sarovar: 155 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project69
Typical within 3 km (88)81
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project58%
Typical within 3 km (90)52%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.80 acres

7,302 m²

Ground covered by buildings
42% of the land

3,065 m²

Floor-area ratio
2.07

Floors built per unit of land: 2.07 m² of floors for each m² of land.

Parking
1.20 per home

149 covered, 0 open

Built-up area, all floors
1,77,454 sq ft

16,486 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
SRI SAI CONSTRUCTIONS
Type
Partnership Firm
PAN
ACVFS9402P
GSTIN
29ACVFS9402P1ZY

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹21.6 crBuilding and development ₹35.1 crTotal ₹56.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹4.6 cr₹2.2 cr
Q4 2025-26₹7.2 cr₹3.9 cr
Q1 2026-27₹4.9 cr₹3.3 cr
Q2 2026-27₹2.6 cr₹2.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.98 kmReliable
  • Nearest railway station3.56 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.41 kmCaveat

Hospitals

  • Nearest hospital1.7 kmCaveat

Schools

  • Schools in pincode 560036 (UDISE+ census)89Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km1Caveat
  • Schools with library + playground + ICT lab (1 km)0Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km8Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.65 kmReliable
  • Nearest sewage treatment plant0.88 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)7.55 kmCaveat
  • Nearest commercial-airport runway20.54 kmReliable
  • Distance to runway approach-path proxy19.83 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.00356, 77.72940), 2026-10-24. Each figure's source and caveat are in the full report.