Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Sri Sai Nandana Regal

by Sri Sai Nandana Builders · 108 homes · 1.65 acres · 1 tower · Anekal

Upcoming Under construction, due Dec 2030. 37% built with 22% of the time used. 44% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
37% built

Due 31 Dec 2030. 22% of the time from RERA approval to the deadline has passed.

Built37%
Time used22%
How much is sold?61 left
44% booked

47 of 108 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
66 homes per acre

Similar projects within 3 km: 80 per acre. 47% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started15 Aug 2025
  2. Approved by RERA26 Aug 2025
  3. Today24 Oct 2026

    22% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-267%
Q4 2025-267%
Q1 2026-2714%
Q2 2026-2737%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

47 booked61 leftQ2 2026-27

Still available: 10 × 2 BHK, 51 × 3 BHK.

Booked, by type

2 BHK10 of 20
3 BHK37 of 88

Booked, each quarter

Q3 2025-263 of 108
Q4 2025-263 of 108
Q1 2026-2713 of 108
Q2 2026-2747 of 108

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 911 sq ft12 homes84.6 m²
  • 896 sq ft4 homes83.2 m²
  • 910 sq ft4 homes84.5 m²
  • 918 sq ft4 homes85.3 m²
  • and 64 homes in other sizes
Typically 64 m² land share · 20 m² balcony/terrace · 1 parking space
88 homes · 81% of the project
2 BHK
  • 718 sq ft4 homes66.7 m²
  • 729 sq ft4 homes67.7 m²
  • 779 sq ft4 homes72.4 m²
  • 783 sq ft4 homes72.7 m²
  • and 4 homes in other sizes
Typically 50 m² land share · 16 m² balcony/terrace · 1 parking space
20 homes · 19% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A3 floors

Tower A: 108 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project66
Typical within 3 km (18)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project47%
Typical within 3 km (18)68%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.65 acres

6,677 m²

Ground covered by buildings
53% of the land

3,528 m²

Floor-area ratio
1.74

Floors built per unit of land: 1.74 m² of floors for each m² of land.

Parking
1.10 per home

112 covered, 7 open

Built-up area, all floors
1,64,096 sq ft

15,245 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of SRI SAI NANDANA BUILDERS on the map

The company

Registered as
Sri Sai Nandana Builders
Type
Partnership Firm
PAN
AEQFS0619M
GSTIN
29AEQFS0619M1ZC

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹5.0 crBuilding and development ₹45.8 crTotal ₹50.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹19.7 lakh₹19.4 lakh
Q4 2025-26₹11.9 lakh₹8.0 lakh
Q1 2026-27₹5.0 cr₹3.5 cr
Q2 2026-27₹16.5 cr₹11.1 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.45 kmReliable
  • Nearest railway station7.46 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.26 kmCaveat

Hospitals

  • Nearest hospital1.97 kmCaveat

Schools

  • Schools in pincode 560105 (UDISE+ census)82Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionJigani PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.93 kmReliable
  • Nearest sewage treatment plant4.56 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)17.1 kmCaveat
  • Nearest commercial-airport runway43.97 kmReliable
  • Distance to runway approach-path proxy42.38 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.79438, 77.64502), 2026-10-24. Each figure's source and caveat are in the full report.