Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SREENIDHI E-CITY

by SREENIDHI DEVELOPERS · 44 homes · 0.64 acres · 1 tower · Anekal

Delivered late Completed: the builder filed for completion on 13 Jan 2026, 13 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 13 Jan 2026, 13 days after the date it first promised.

How much is sold?1 left
98% booked

43 of 44 homes, as the builder reported for Q3 2025-26.

How crowded is it?Less crowded
68 homes per acre

Similar projects within 3 km: 82 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Jul 2023
  2. Approved by RERA9 Nov 2023
  3. Completion filed13 Jan 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-26100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

43 booked1 leftQ3 2025-26

Still available: 1 × 2 BHK.

Booked, by type

2 BHK7 of 8
3 BHK36 of 36

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
877 sq ft
82 m² carpet · sizes 877–1,095 sq ft (8 at this size)
55 m² land share · 13 m² balcony/terrace · 1 parking space
36 homes · 82% of the project
2 BHK
739 sq ft
69 m² carpet
43 m² land share · 9 m² balcony/terrace · 1 parking space
8 homes · 18% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Sreenidhi E-City4 floors

Sreenidhi E-City: 44 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (30)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (30)66%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.64 acres

2,608 m²

Ground covered by buildings
49% of the land

1,290 m²

Floor-area ratio
1.74

Floors built per unit of land: 1.74 m² of floors for each m² of land.

Parking
1.09 per home

48 covered, 0 open

Built-up area, all floors
58,943 sq ft

5,476 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
SREENIDHI DEVELOPERS
Type
Partnership Firm
PAN
ABHFS7250C
GSTIN
29ABHFS7250C1Z3

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹6.2 crBuilding and development ₹16.2 crTotal ₹22.4 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹3.1 cr₹3.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.9 kmReliable
  • Nearest railway station6.81 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.41 kmCaveat

Hospitals

  • Nearest hospital1.23 kmCaveat

Schools

  • Schools in pincode 560100 (UDISE+ census)75Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionJigani PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km10Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.63 kmReliable
  • Nearest sewage treatment plant4.57 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)13.18 kmCaveat
  • Nearest commercial-airport runway40.03 kmReliable
  • Distance to runway approach-path proxy38.55 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.82966, 77.65059), 2026-10-24. Each figure's source and caveat are in the full report.