SREE URBAN ORCHIDS PHASE-II

by Sree Builders and Developers · 256 homes · 3.62 acres · 3 towers · Bengaluru East

Upcoming Under construction, due Mar 2028. 58% built with 71% of the time used. 47% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
58% built

Due 31 Mar 2028. 71% of the time from RERA approval to the deadline has passed.

Built58%
Time used71%
How much is sold?136 left
47% booked

120 of 256 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
71 homes per acre

Similar projects within 3 km: 81 per acre. 45% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started3 Mar 2023
  2. Approved by RERA16 May 2023
  3. Today24 Oct 2026

    71% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2645%
Q4 2025-2650%
Q1 2026-2756%
Q2 2026-2758%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block-A73%
BLOCk-B73%
Block-C68%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

120 booked136 leftQ2 2026-27

Still available: 38 × 2 BHK, 84 × 3 BHK, 9 × 4 BHK, 2 × AMENITIES, 1 × NA, 2 × CA.

Booked, by type

2 BHK45 of 83
3 BHK70 of 154
4 BHK5 of 14
AMENITIES0 of 2
NA0 of 1
CA0 of 2

Booked, each quarter

Q3 2025-26105 of 255
Q4 2025-26111 of 256
Q1 2026-27116 of 256
Q2 2026-27120 of 256

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
920 sq ft
86 m² carpet · sizes 770–1,218 sq ft (110 at this size)
62 m² land share · 17 m² balcony/terrace · 1 parking space
154 homes · 61% of the project
2 BHK
779 sq ft
72 m² carpet · sizes 770–920 sq ft (34 at this size)
54 m² land share · 15 m² balcony/terrace · 1 parking space
83 homes · 33% of the project
4 BHK
1,435 sq ft
133 m² carpet · sizes 920–1,435 sq ft (8 at this size)
91 m² land share · 20 m² balcony/terrace · 1 parking space
14 homes · 6% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block-A3 floors
BLOCk-B3 floors
Block-C3 floors

Block-A: 112 homes, 12 m tall, 1 basement · BLOCk-B: 112 homes, 12 m tall, 1 basement · Block-C: 32 homes, 12 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project71
Typical within 3 km (97)81
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project45%
Typical within 3 km (97)75%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.62 acres

14,660 m²

Ground covered by buildings
55% of the land

8,065 m²

Floor-area ratio
1.75

Floors built per unit of land: 1.75 m² of floors for each m² of land.

Parking
1.00 per home

256 covered, 0 open

Built-up area, all floors
2,58,420 sq ft

24,008 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of SREE BUILDERS AND DEVELOPERS on the map

The company

Registered as
Sree Builders and Developers
Type
Partnership Firm
PAN
AEGFS0457P
GSTIN
29AEGFS0457P1ZC

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹17.8 crBuilding and development ₹80.7 crTotal ₹98.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹43.8 cr₹43.8 cr
Q4 2025-26₹7.4 cr₹22.6 cr
Q1 2026-27₹5.5 cr₹3.7 cr
Q2 2026-27₹3.3 cr₹2.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station4.7 kmReliable
  • Nearest railway station3.3 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km6Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.73 kmCaveat

Hospitals

  • Nearest hospital0.24 kmCaveat

Schools

  • Schools in pincode 560103 (UDISE+ census)22Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km19.4 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionMarathahalli PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well4.5 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.42 kmReliable
  • Nearest sewage treatment plant1.24 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)2.54 kmCaveat
  • Nearest commercial-airport runway27.91 kmReliable
  • Distance to runway approach-path proxy27.4 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (12.93707, 77.70254), 2026-10-24. Each figure's source and caveat are in the full report.