Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SREE NIDHI BRINDHAVAN

by SREE NIDHI DEVELOPERS · 64 homes · 0.77 acres · 2 towers · Anekal

Upcoming Under construction, due Dec 2028. 20% built with 24% of the time used. 5% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
20% built

Due 27 Dec 2028. 24% of the time from RERA approval to the deadline has passed.

Built20%
Time used24%
How much is sold?61 left
5% booked

3 of 64 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
83 homes per acre

Similar projects within 3 km: 72 per acre. 45% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started26 Sep 2025
  2. Approved by RERA21 Feb 2026
  3. Today24 Oct 2026

    24% of the time to the deadline has passed.

  4. If it slips like a typical project28 Sep 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q4 2025-266%
Q1 2026-2716%
Q2 2026-2720%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block - A20%
Block - B20%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

3 booked61 leftQ2 2026-27

Still available: 35 × 2 BHK, 26 × 3 BHK.

Booked, by type

2 BHK1 of 36
3 BHK2 of 28

Booked, each quarter

Q4 2025-260 of 64
Q1 2026-271 of 64
Q2 2026-273 of 64

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
  • 564 sq ft4 homes52.4 m²
  • 601 sq ft4 homes55.8 m²
  • 616 sq ft4 homes57.2 m²
  • 653 sq ft4 homes60.7 m²
  • and 20 homes in other sizes
Typically 44 m² land share · 16 m² balcony/terrace · 1 parking space
36 homes · 56% of the project
3 BHK
  • 797 sq ft3 homes74.0 m²
  • 805 sq ft3 homes74.8 m²
  • 827 sq ft3 homes76.8 m²
  • 888 sq ft3 homes82.5 m²
  • and 16 homes in other sizes
Typically 56 m² land share · 27 m² balcony/terrace · 1 parking space
28 homes · 44% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block - A4 floors
Block - B4 floors

Block - A: 32 homes, 14 m tall · Block - B: 32 homes, 14 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project83
Typical within 3 km (83)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project45%
Typical within 3 km (83)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.77 acres

3,110 m²

Ground covered by buildings
55% of the land

1,709 m²

Floor-area ratio
1.75

Floors built per unit of land: 1.75 m² of floors for each m² of land.

Parking
1.14 per home

64 covered, 9 open

Built-up area, all floors
83,775 sq ft

7,783 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
SREE NIDHI DEVELOPERS
Type
Partnership Firm
PAN
AFIFS1347D
GSTIN
29AFIFS1347D1ZY

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹9.3 crBuilding and development ₹59.0 crTotal ₹68.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q4 2025-26₹0.0 lakh₹0.0 lakh
Q1 2026-27₹24.5 lakh₹21.0 lakh
Q2 2026-27₹31.8 lakh₹32.5 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.58 kmReliable
  • Nearest railway station5.7 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.33 kmCaveat

Hospitals

  • Nearest hospital0.67 kmCaveat

Schools

  • Schools in pincode 560068 (UDISE+ census)144Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km12Caveat
  • Median pupil-teacher ratio, schools within 1 km24.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)9Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)1.12 kmReliable
  • Nearest sewage treatment plant1.32 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.59 kmCaveat
  • Nearest commercial-airport runway33.41 kmReliable
  • Distance to runway approach-path proxy32.08 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.88924, 77.65667), 2026-10-24. Each figure's source and caveat are in the full report.