RERA project · Residential/Group Housing

SREE ADITHYA LOTUS PARK

by SREE ADITHYA DEVELOPERS · 141 homes · 2.00 acres · 2 towers · Bengaluru East

Delivered late Completed: the builder filed for completion on 8 Oct 2026, 8 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 8 Oct 2026, 8 days after the date it first promised.

How much is sold?36 left
74% booked

105 of 141 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
70 homes per acre

Similar projects within 3 km: 82 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?4 due so far
0% on time

Of its 5 RERA projects in Bengaluru Urban: 0 delivered on time, 4 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Jan 2024
  2. Approved by RERA30 Jan 2024
  3. Completion filed8 Oct 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-2698%
Q4 2025-26100%
Q1 2026-2798%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Sree Adithya Lotus Park Block - A100%
Sree Adithya Lotus Park Block - B100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

105 booked36 leftQ2 2026-27

Still available: 4 × 2 BHK, 32 × 3 BHK.

Booked, by type

2 BHK89 of 93
3 BHK16 of 48

Booked, each quarter

Q3 2025-2672 of 141
Q4 2025-2677 of 141
Q1 2026-2777 of 141
Q2 2026-27105 of 141

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
746 sq ft
69 m² carpet · sizes 724–865 sq ft (12 at this size)
50 m² land share · 1 parking space
93 homes · 66% of the project
3 BHK
953 sq ft
88 m² carpet · sizes 953–1,287 sq ft (4 at this size)
67 m² land share · 1 parking space
48 homes · 34% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Sree Adithya Lotus Park Block - A3 floors
Sree Adithya Lotus Park Block - B3 floors

Sree Adithya Lotus Park Block - A: 61 homes, 15 m tall · Sree Adithya Lotus Park Block - B: 80 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project70
Typical within 3 km (81)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (82)52%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.00 acres

8,093 m²

Ground covered by buildings
50% of the land

4,044 m²

Floor-area ratio
1.74

Floors built per unit of land: 1.74 m² of floors for each m² of land.

Parking
1.11 per home

157 covered, 0 open

Built-up area, all floors
2,00,887 sq ft

18,663 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 5 RERA projects of Sree Adithya Developers on the map

The company

Registered as
SREE ADITHYA DEVELOPERS
Type
Partnership Firm
PAN
ADBFS1720M
GSTIN
29ADBFS1720M1ZX

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹12.8 crBuilding and development ₹32.1 crTotal ₹44.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹2.1 cr₹1.5 cr
Q4 2025-26₹9.1 cr₹6.4 cr
Q1 2026-27₹9.1 cr₹6.4 cr
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.03 kmReliable
  • Nearest railway station4.96 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.53 kmCaveat

Hospitals

  • Nearest hospital0.12 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionK.R. Puram PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km4Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.29 kmReliable
  • Nearest sewage treatment plant0.58 kmCaveat
  • Industrial zones within 1 km8Caveat
  • Nearest airfield runway (any, incl. military)8.1 kmCaveat
  • Nearest commercial-airport runway19.07 kmReliable
  • Distance to runway approach-path proxy18.53 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.01692, 77.71802), 2026-10-24. Each figure's source and caveat are in the full report.