by Spectra Constructions Private Limited · 318 homes · 4.28 acres · 7 towers · Bengaluru East

Delivered on time Completed: the builder filed for completion on 30 Dec 2023, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 30 Dec 2023, by the date it promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
74 homes per acre

Similar projects within 3 km: 72 per acre. 79% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?3 due so far
67% on time

Of its 5 RERA projects in Bengaluru Urban: 2 delivered on time, 1 past due with no completion filed, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Jul 2019
  2. Approved by RERA9 Aug 2019
  3. Completion filed30 Dec 2023

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

  4. First promised30 Jun 2024

    The date the builder gave at registration.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
901 sq ft
84 m² carpet · sizes 901–922 sq ft (81 at this size)
39 m² land share · 7 m² balcony/terrace · 1 parking space
162 homes · 51% of the project
3BHK
1,181 sq ft
110 m² carpet · sizes 1,181–1,212 sq ft (81 at this size)
52 m² land share · 8 m² balcony/terrace · 1 parking space
156 homes · 49% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A11 floors
Tower B11 floors
Tower C11 floors
Tower D11 floors
Tower E11 floors
Tower F11 floors
Tower G11 floors

Tower A: 36 homes, 1 basement · Tower B: 47 homes, 1 basement · Tower C: 47 homes, 1 basement · Tower D: 47 homes, 1 basement · Tower E: 47 homes, 1 basement · Tower F: 47 homes, 1 basement · Tower G: 47 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project74
Typical within 3 km (91)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project79%
Typical within 3 km (91)63%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.28 acres

17,323 m²

Ground covered by buildings
21% of the land

3,609 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 5 RERA projects of Spectra Constructions Private Limited on the map

The company

Registered as
Spectra Constructions Private Limited
Type
Company
Company number
U45209KA1999PTC025826

CIN or LLPIN, from the Registrar of Companies.

PAN
AAFCS8564H

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹45.2 cr
Construction
₹124.3 cr
Total project cost
₹169.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.81 kmReliable
  • Nearest railway station5.14 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km4Caveat
  • Parks within 1 km11Caveat
  • Nearest lake / water body (≥2 ha)0.66 kmCaveat

Hospitals

  • Nearest hospital0.54 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km37.1 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionWhitefield PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.44 kmReliable
  • Nearest sewage treatment plant1.64 kmCaveat
  • Industrial zones within 1 km8Caveat
  • Nearest airfield runway (any, incl. military)5.11 kmCaveat
  • Nearest commercial-airport runway25.23 kmReliable
  • Distance to runway approach-path proxy24.46 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.96120, 77.73040), 2026-10-24. Each figure's source and caveat are in the full report.