Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Sobha Royal Pavilion Phase 2 - Wing 4 and 5

by Sobha Limited · 151 homes · 2.62 acres · 2 towers · Bengaluru East

Delivered late Completed: the builder filed for completion on 17 Feb 2026, 871 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 17 Feb 2026, 871 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?Less crowded
58 homes per acre

Similar projects within 3 km: 70 per acre. 88% of the land is left open.

Any complaints?See the list
2 complaints

Complaints to RERA about this project. 224 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?68 due so far
12% on time

Of its 110 RERA projects in Bengaluru Urban: 8 delivered on time, 54 late (after the date first promised), 6 past due with no completion filed, 34 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started24 Oct 2018
  2. Approved by RERA4 Feb 2019
  3. First promised30 Sep 2023

    The date the builder gave at registration.

  4. Completion filed17 Feb 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3BHK
1,091 sq ft
101 m² carpet · sizes 1,077–1,330 sq ft (72 at this size)
55 m² land share · 39 m² balcony/terrace · 1 parking space
143 homes · 95% of the project
2BHK
914 sq ft
85 m² carpet · sizes 914–989 sq ft (4 at this size)
48 m² land share · 37 m² balcony/terrace · 1 parking space
8 homes · 5% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing 418 floors
wing 518 floors

Wing 4: 75 homes, 2 basements · wing 5: 76 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project58
Typical within 3 km (100)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project88%
Typical within 3 km (100)68%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.62 acres

10,616 m²

Ground covered by buildings
12% of the land

1,307 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 110 RERA projects of Sobha on the map

Complaints to RERA about its other projects

224 complaints across 65 projects. The most complained about:

Show all 65 projects
  • Sobha Lake Gardens Phase 1 9 complaints
  • Sobha Dream Acres - Tropical Greens Phase 25 Wing 32, 33 and 34 8 complaints
  • Sobha Arena - The Square (Block 4) 7 complaints
  • Sobha HRC Pristine Phase 2 Block 2 7 complaints
  • Sobha Sentosa Phase 4 Wing 1 and 2 7 complaints
  • Sobha Forest Edge 6 complaints
  • Sobha Sentosa Phase 3 Wing 3 and 4 6 complaints
  • Sobha Indraprastha 5 complaints
  • Sobha Dream Acres - Tropical Greens Phase 26 Wing 35, 36, 37 and 38 5 complaints
  • Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18 &19 5 complaints
  • Sobha Sentosa Phase 1 Wing 7 5 complaints
  • Sobha Arena - The Plaza (Block 3) 4 complaints
  • Sobha Lake Gardens Phase 2 4 complaints
  • Sobha Royal Pavilion Phase 1 - Wing 6 and 7 4 complaints
  • Sobha Neopolis Phase 4 - 3, 4, 8 & 9 4 complaints
  • Sobha Arena - Pebble Court (Block 1) 3 complaints
  • Sobha Dream Acres - Rain Forest Phase 2 Wing 3 and 4 3 complaints
  • Sobha Dream Acres - Tropical Greens Phase 10 Wing 46 3 complaints
  • Sobha Dream Acres - Tropical Greens Phase 19 Wings 19 and 20 3 complaints
  • Sobha Clovelly 3 complaints
  • Sobha Dream Gardens Phase 2 ? Wing 5, 6 and 7 3 complaints
  • Sobha HRC Pristine Phase 1 Block 1 3 complaints
  • Sobha Dream Gardens Phase 3 - Wing 3 and 4 3 complaints
  • Sobha Madison Heights-Townpark Phase 1 W5 to 7 3 complaints
  • Sobha Dream Acres - Tropical Greens Phase 7 Wing 42 2 complaints
  • Sobha Dream Acres - Tropical Greens Phase 20 Wing 18 2 complaints
  • Sobha Dream Gardens Phase 1 – Wing 8 and 9 2 complaints
  • Sobha Royal Pavilion Phase 6 - Wing 10 and 11 2 complaints
  • Sobha Royal Pavilion Phase 4 - Wing 1, 2 and 3 2 complaints
  • Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 2 complaints
  • Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 2 complaints
  • Sobha Royal Crest 2 complaints
  • Sobha Neopolis Phase 3 - W 1, 2, 10 & 11 2 complaints
  • Sobha Neopolis Phase 2 - W 12 & 13 2 complaints
  • Sobha Neopolis Phase 5 - W 5, 6 & 7 2 complaints
  • Sobha Dream Acres - Palm Springs Phase 17 Wing 54 1 complaint
  • Sobha Arena - The Park ( Block 2 ) 1 complaint
  • Sobha Silicon Oasis Phase 5 Wing 10 & 11 1 complaint
  • Sobha Morzaria Grandeur 2 (W1) 1 complaint
  • Sobha City Athena 1 complaint
  • Sobha Dream Gardens Phase 2 – Wing 5, 6 and 7 1 complaint
  • Sobha Dream Acres Wing 50 1 complaint
  • Sobha Silicon Oasis Phase 3 Wing 8 1 complaint
  • Sobha Silicon Oasis Phase 1 Wing 1, 2, 3, 4, 5 & 6 1 complaint
  • Sobha Windsor Phase 1 Wing 1 and 2:::PRM/KA/RERA/1251/446/PR/210219/003939 1 complaint
  • Sobha Dream Acres - Tropical Greens Phase 6 Wing 41 1 complaint
  • Sobha Windsor Phase 2 Wing 3, 4 and 5 1 complaint
  • Sobha Dream Gardens Phase 1 ? Wing 8 and 9 1 complaint
  • Sobha Dream Acres - Rain forest Phase 1 Wing 1 and 2 1 complaint
  • Sobha Insignia 1 complaint
  • Sobha Brooklyn Towers - Town Park Phase 2, W2 1 complaint
  • Sobha HRC Pristine Phase 4 Block 4 and 5 1 complaint
  • Sobha - HRC Pristine Phase 3 Block 3 1 complaint
  • Sobha Victoria park phase 1 1 complaint
  • Sobha Dream Gardens Phase 4 - Wing 1 and 2 1 complaint
  • Sobha Galera 1 complaint
  • Sobha Dream Acres - Rain Forest Phase 4 Wing 11 1 complaint
  • Sobha Windsor Phase 4 Wing 9, 10 and 11 1 complaint
  • Sobha Silicon Oasis Phase 2 Wing 7 1 complaint
  • Sobha Royal Pavilion Phase 3 - Wing 16 1 complaint

The company

Registered as
Sobha Limited
Type
Company
Company number
L45201KA1995PLC018475

CIN or LLPIN, from the Registrar of Companies.

PAN
AABCS7723E

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹66.3 cr
Construction
₹116.2 cr
Total project cost
₹182.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station6.14 kmReliable
  • Nearest railway station1.21 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km10Caveat
  • Nearest lake / water body (≥2 ha)0.65 kmCaveat

Hospitals

  • Nearest hospital0.93 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)0Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBellanduru PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.95 kmReliable
  • Nearest sewage treatment plant2.61 kmCaveat
  • Industrial zones within 1 km6Caveat
  • Nearest airfield runway (any, incl. military)6.41 kmCaveat
  • Nearest commercial-airport runway32.38 kmReliable
  • Distance to runway approach-path proxy31.85 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (12.89666, 77.70357), 2026-10-24. Each figure's source and caveat are in the full report.