Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SLV ENCLAVE

by SLV BUILDERS AND DEVELOPERS · 70 homes · 0.76 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Mar 2029. 69% built with 39% of the time used. 26% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
69% built

Due 31 Mar 2029. 39% of the time from RERA approval to the deadline has passed.

Built69%
Time used39%
How much is sold?52 left
26% booked

18 of 70 homes, as the builder reported for Q3 2025-26.

How crowded is it?More crowded
92 homes per acre

Similar projects within 3 km: 80 per acre. 38% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 2 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Nov 2023
  2. Approved by RERA7 Apr 2025
  3. Today24 Oct 2026

    39% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2669%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

18 booked52 leftQ3 2025-26

Still available: 38 × 2 BHK, 14 × 3 BHK.

Booked, by type

2 BHK12 of 50
2.5 BHK1 of 1
3 BHK5 of 19

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
  • 850 sq ft10 homes79.0 m²
  • 903 sq ft9 homes83.9 m²
  • 860 sq ft5 homes79.9 m²
  • 871 sq ft5 homes80.9 m²
  • and 20 homes in other sizes
Typically 44 m² land share · 24 m² balcony/terrace · 1 parking space
49 homes · 71% of the project
3 BHK
  • 1,052 sq ft5 homes97.7 m²
  • 1,069 sq ft5 homes99.3 m²
  • 1,143 sq ft5 homes106.2 m²
  • 1,033 sq ft4 homes96.0 m²
Typically 54 m² land share · 30 m² balcony/terrace · 1 parking space
19 homes · 28% of the project
2.5 BHK
  • 1,033 sq ft1 home96.0 m²
Typically 52 m² land share · 29 m² balcony/terrace · 1 parking space
1 home · 1% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Slv Enclave4 floors

Slv Enclave: 70 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project92
Typical within 3 km (97)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project38%
Typical within 3 km (99)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.76 acres

3,072 m²

Ground covered by buildings
62% of the land

1,901 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
0.00 per home

0 covered, 0 open

Built-up area, all floors
76,262 sq ft

7,085 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of SLV BUILDERS AND DEVELOPERS on the map

The company

Registered as
SLV BUILDERS AND DEVELOPERS
Type
Partnership Firm
PAN
AFDFS1217B
GSTIN
29AFDFS1217B1ZE

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹16.0 crBuilding and development ₹28.2 crTotal ₹44.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹7.9 cr₹7.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.94 kmReliable
  • Nearest railway station2.94 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.95 kmCaveat

Hospitals

  • Nearest hospital1.81 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Median pupil-teacher ratio, schools within 1 km25.1 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km8Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.51 kmReliable
  • Nearest sewage treatment plant1.44 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)7.9 kmCaveat
  • Nearest commercial-airport runway20.4 kmReliable
  • Distance to runway approach-path proxy19.57 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.00506, 77.73579), 2026-10-24. Each figure's source and caveat are in the full report.