RERA project · Plotted Development
SIDVIN HORIZON BY THE LAKE
by SIDVIN DEVELOPERS PRIVATE LIMITED · 29 plots · 1.60 acres · Bengaluru East
Upcoming Under construction, due Jul 2027. 78% built with 60% of the time used.
At a glance
Due 31 Jul 2027. 60% of the time from RERA approval to the deadline has passed.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 15 per acre. 61% of the land is left open.
Complaints to RERA about this project.
The builder declares litigation on the land or the project.
Of its 3 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 1 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started1 Jul 2025
- Approved by RERA4 Sep 2025
- Today24 Oct 2026
60% of the time to the deadline has passed.
- Deadline31 Jul 2027
The date it must be complete by.
- If it slips like a typical project1 May 2028
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Plots per acre
Fewer plots on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 1.60 acres
- Plot area (the sites)
- 39% of the land
- Roads
- 2,034 m²
- Parks and open spaces
- 1,830 m²
- Civic amenity sites
- 111 m²
6,474 m²
2,499 m²
Sites kept for public uses such as a school or a health centre.
CaveatAs registered on RERA Karnataka. "Typical" is the median of active plotted development projects with a land area on RERA; the comparison is ours.
Who is building it?
All 3 RERA projects of SIDVIN DEVELOPERS PRIVATE LIMITED on the map
The company
- Registered as
- SIDVIN DEVELOPERS PRIVATE LIMITED
- Type
- Company
- Company number
- U45400KA2013PTC070369
- PAN
- AAECV5256C
- GSTIN
- 29AAECV5256C3Z7
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
- SIZZLE SIDVIN HORIZEN PRM/KA/RERA/1251/446/PR/060324/006689 · approved 6 Mar 2024
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/040925/008057 · Approved
- Building plan approvedBDA - Bangalore Development Authority · BDA/TPA/PRL/1060/2024-25 · 29 May 2025
- Litigation on the landDeclared by the builder
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell,Local Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
126 files on the RERA page: Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹70.0 lakh | ₹70.0 lakh |
| Q4 2025-26 | ₹94.5 lakh | ₹94.5 lakh |
| Q1 2026-27 | ₹8.5 cr | ₹8.5 cr |
| Q2 2026-27 | ₹22.8 cr | ₹61.6 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station6.47 kmReliable
- Nearest railway station6.43 kmReliable
- Bus stops within 500 m2Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km1Caveat
- Nearest lake / water body (≥2 ha)0.18 kmCaveat
Hospitals
- Nearest hospital2.63 kmCaveat
Schools
- Schools in pincode 560049 (UDISE+ census)110Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionAvalahally PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well60.8 m below groundCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km1Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)4.1 kmReliable
- Nearest sewage treatment plant0.81 kmCaveat
- Industrial zones within 1 km4Caveat
- Nearest airfield runway (any, incl. military)8.36 kmCaveat
- Nearest commercial-airport runway15.25 kmReliable
- Distance to runway approach-path proxy13.91 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (13.05424, 77.75512), 2026-10-24. Each figure's source and caveat are in the full report.