RERA project · Residential/Group Housing
Sidvin Grace
by sidvin developers · 100 homes · 1.17 acres · 1 tower · Bengaluru North
Delivered late Completed: the builder filed for completion on 1 Aug 2020, 400 days after the date it first promised.
At a glance
The builder filed for completion on 1 Aug 2020, 400 days after the date it first promised.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 91 per acre. 56% of the land is left open.
Complaints to RERA about this project.
The RERA page doesn't say.
Of its 3 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 1 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started3 Apr 2017
- Approved by RERA31 Oct 2017
- First promised28 Jun 2019
The date the builder gave at registration.
- Completion filed1 Aug 2020
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.
Towers
Grace: 100 homes, 1 basement
Amenities
- Electricity
- CCTV Surveillance
- Community Hall
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 1.17 acres
- Ground covered by buildings
- 44% of the land
4,755 m²
2,109 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 3 RERA projects of SIDVIN DEVELOPERS PRIVATE LIMITED on the map
The company
- Registered as
- sidvin developers
- Type
- Partnership Firm
- PAN
- ADAFS0045A
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/309/PR/171031/001277 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike
- Litigation on the landNot stated
- Litigation on the projectNot stated
Complaints to RERA about this project
None on RERA Karnataka.
Documents
84 files on the RERA page: Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
- Land
- ₹20.0 cr
- Construction
- ₹22.0 cr
- Total project cost
- ₹44.0 cr
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station3.17 kmReliable
- Nearest railway station3.28 kmReliable
- Bus stops within 500 m3Caveat
Parks, shops, daily needs
- Supermarkets within 1 km4Caveat
- Parks within 1 km9Caveat
- Nearest lake / water body (≥2 ha)0.69 kmCaveat
Hospitals
- Nearest hospital0.39 kmCaveat
Schools
- Schools in pincode 560056 (UDISE+ census)59Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km9Caveat
- Median pupil-teacher ratio, schools within 1 km10.9 :1Caveat
- Schools with library + playground + ICT lab (1 km)7Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionJnanabharathi PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)11 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km3Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km6Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)17.83 kmReliable
- Nearest sewage treatment plant0.86 kmCaveat
- Industrial zones within 1 km3Caveat
- Nearest airfield runway (any, incl. military)16.63 kmCaveat
- Nearest commercial-airport runway32.79 kmReliable
- Distance to runway approach-path proxy27.11 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.96049, 77.49812), 2026-10-24. Each figure's source and caveat are in the full report.