Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SHRIRAM SAPPHIRE

by SHRIRAM PROPERTIES LIMITED · 414 homes · 5.65 acres · 6 towers · Bengaluru South

Upcoming Under construction, due Nov 2028. 61% built with 57% of the time used. 100% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
61% built

Due 5 Nov 2028. 57% of the time from RERA approval to the deadline has passed.

Built61%
Time used57%
How much is sold?0 left
100% booked

414 of 414 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
73 homes per acre

Similar projects within 3 km: 74 per acre. 72% of the land is left open.

Any complaints?See the list
3 complaints

Complaints to RERA about this project. 120 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?26 due so far
15% on time

Of its 32 RERA projects in Bengaluru Urban: 4 delivered on time, 7 late (after the date first promised), 15 past due with no completion filed, 6 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Dec 2023
  2. Approved by RERA9 Feb 2024
  3. Today24 Oct 2026

    57% of the time to the deadline has passed.

  4. If it slips like a typical project7 Aug 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2650%
Q4 2025-2653%
Q1 2026-2756%
Q2 2026-2761%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A46%
B64%
C78%
D61%
E74%
F46%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

414 booked0 leftQ2 2026-27

Booked, by type

2 BHK188 of 188
3 BHK226 of 226

Booked, each quarter

Q3 2025-26414 of 414
Q4 2025-26414 of 414
Q1 2026-27414 of 414
Q2 2026-27414 of 414

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 840 sq ft77 homes78.0 m²
  • 857 sq ft56 homes79.6 m²
  • 856 sq ft23 homes79.5 m²
  • 837 sq ft21 homes77.8 m²
  • and 49 homes in other sizes
Typically 49 m² land share · 3 m² balcony/terrace · 1 parking space
226 homes · 55% of the project
2 BHK
  • 654 sq ft50 homes60.8 m²
  • 658 sq ft23 homes61.1 m²
  • 656 sq ft21 homes60.9 m²
  • 662 sq ft21 homes61.5 m²
  • and 73 homes in other sizes
Typically 38 m² land share · 3 m² balcony/terrace · 1 parking space
188 homes · 45% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A7 floors
B7 floors
C7 floors
D8 floors
E7 floors
F7 floors

A: 84 homes, 24 m tall, 1 basement · B: 70 homes, 24 m tall, 1 basement · C: 62 homes, 24 m tall, 1 basement · D: 72 homes, 27 m tall, 1 basement · E: 56 homes, 24 m tall, 1 basement · F: 70 homes, 24 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project73
Typical within 3 km (32)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project72%
Typical within 3 km (33)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.65 acres

22,865 m²

Ground covered by buildings
28% of the land

6,312 m²

Floor-area ratio
1.97

Floors built per unit of land: 1.97 m² of floors for each m² of land.

Parking
1.21 per home

486 covered, 16 open

Built-up area, all floors
6,38,353 sq ft

59,305 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 32 RERA projects of Shriram Properties on the map

Complaints to RERA about its other projects

120 complaints across 8 projects. The most complained about:

Show all 8 projects
  • Shriram Summitt 1 complaint
  • SHRIRAM SUMMITT:::PRM/KA/RERA/1251/308/PR/171015/001121 1 complaint
  • SHRIRAM SERENITY 1 complaint

The company

Registered as
SHRIRAM PROPERTIES LIMITED
Type
Company
Company number
U72200TN2000PLC044560

CIN or LLPIN, from the Registrar of Companies.

PAN
AAFCS5801D
GSTIN
29AAFCS5801D1ZI

Its other registrations on RERA Karnataka

6 registrations under this company
  • SHRIRAM SONGS OF THE EARTH PRM/KA/RERA/1251/310/PR/120625/007819 · approved 12 Jun 2025
  • SHRIRAM SERENITY PRM/KA/RERA/1251/309/PR/170924/007026 · approved 17 Sep 2024
  • SHRIRAM ESQUIRE PRM/KA/RERA/1251/310/PR/080223/005702 · approved 8 Feb 2023
  • SHRIRAM SUMMITT PRM/KA/RERA/1251/308/PR/171015/001121 · approved 15 Oct 2017
  • SHRIRAM HEBBAL ONE PRM/KA/RERA/1251/309/PR/171013/001159 · approved 13 Oct 2017
  • SHRIRAM SAMEEKSHA PRM/KA/RERA/1251/309/PR/171010/001126 · approved 10 Oct 2017

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹21.2 crBuilding and development ₹148.8 crTotal ₹170.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹22.6 cr₹15.3 cr
Q4 2025-26₹20.5 cr₹11.4 cr
Q1 2026-27₹21.7 cr₹17.2 cr
Q2 2026-27₹27.2 cr₹18.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.66 kmReliable
  • Nearest railway station2.22 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.3 kmCaveat

Hospitals

  • Nearest hospital1.34 kmCaveat

Schools

  • Schools in pincode 560100 (UDISE+ census)75Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km24.1 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAttibele PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.3 kmReliable
  • Nearest sewage treatment plant1.8 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)14.24 kmCaveat
  • Nearest commercial-airport runway40.54 kmReliable
  • Distance to runway approach-path proxy39.81 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.82297, 77.69317), 2026-10-24. Each figure's source and caveat are in the full report.