Neighborhood IntelOpen on the map

RERA project · Commercial

SHRIRAM HEBBAL 1

by Shriram Upscale Space Private Limited · 9 homes · 1.80 acres · 1 tower · Bengaluru North

Delivered on time Completed: the builder filed for completion on 11 Aug 2026, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 11 Aug 2026, by the date it promised.

How much is sold?0 left
100% booked

9 of 9 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
5 homes per acre

Similar projects within 3 km: 54 per acre. 67% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?26 due so far
15% on time

Of its 32 RERA projects in Bengaluru Urban: 4 delivered on time, 7 late (after the date first promised), 15 past due with no completion filed, 6 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started6 Feb 2023
  2. Approved by RERA15 Feb 2023
  3. Completion filed11 Aug 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-26100%
Q4 2025-26100%
Q1 2026-27100%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

9 booked0 leftQ2 2026-27

Booked, by type

COMMERCIAL9 of 9

Booked, each quarter

Q3 2025-269 of 9
Q4 2025-269 of 9
Q1 2026-279 of 9
Q2 2026-279 of 9

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

COMMERCIAL
24,111 sq ft
2,240 m² carpet · sizes 20,182–24,111 sq ft (7 at this size)
825 m² land share · 51 parking spaces
9 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Commercial Building8 floors

Commercial Building: 9 homes, 35 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project5
Typical within 3 km (3)54
Typical in the city (76)14

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project67%
Typical within 3 km (3)69%
Typical in the city (76)64%

The share of the land not built on, which includes roads.

Land
1.80 acres

7,284 m²

Ground covered by buildings
33% of the land

2,391 m²

Floor-area ratio
3.00

Floors built per unit of land: 3.00 m² of floors for each m² of land.

Parking
52.22 per home

449 covered, 21 open

Built-up area, all floors
3,48,557 sq ft

32,382 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active commercial projects with a land area on RERA; the comparison is ours.

Who is building it?

All 32 RERA projects of Shriram Properties on the map

The company

Registered as
Shriram Upscale Space Private Limited
Type
Company
Company number
U45500KA2017PTC099721

CIN or LLPIN, from the Registrar of Companies.

PAN
AAYCS0686H
GSTIN
29AAYCS0686H1ZV

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹10.9 crBuilding and development ₹118.5 crTotal ₹129.4 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹93.6 lakh₹65.5 lakh
Q1 2026-27₹0.0 lakh₹0.0 lakh
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.9 kmReliable
  • Nearest railway station1.5 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km4Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.81 kmCaveat

Hospitals

  • Nearest hospital1.02 kmCaveat

Schools

  • Schools in pincode 560024 (UDISE+ census)28Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km16Caveat
  • Median pupil-teacher ratio, schools within 1 km17.9 :1Caveat
  • Schools with library + playground + ICT lab (1 km)9Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAmruthahally PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km6Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.23 kmReliable
  • Nearest sewage treatment plant0.38 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)3.6 kmCaveat
  • Nearest commercial-airport runway18.83 kmReliable
  • Distance to runway approach-path proxy14.77 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)2Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (13.04404, 77.59999), 2026-10-24. Each figure's source and caveat are in the full report.