RERA project · Residential/Group Housing
Serene Amara by Columbia Pacific
by Embassy-Columbia Pacific ASL Pvt Ltd · 239 homes · 2.44 acres · 2 towers · Bengaluru North
Delivered on time Completed: the builder filed for completion on 30 Sep 2026, by the date it promised.
At a glance
The builder filed for completion on 30 Sep 2026, by the date it promised.
236 of 239 homes, as the builder reported for Q1 2026-27.
Similar projects within 3 km: 46 per acre. 70% of the land is left open.
Complaints to RERA about this project.
The builder declares litigation on the land or the project.
Of its 9 RERA projects in Bengaluru Urban: 2 delivered on time, 2 late (after the date first promised), 5 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started1 Jan 2023
- Approved by RERA16 Feb 2023
- Completion filed30 Sep 2026
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q1 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 2 × 1 BHK, 1 × 2 BHK.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Wing A: 120 homes, 56 m tall, 1 basement · Wing B: 119 homes, 56 m tall, 1 basement
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Indoor Sports facility
- Gym
- Parks
- Power Backup
- Piped Gas
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.44 acres
- Ground covered by buildings
- 30% of the land
- Floor-area ratio
- 2.50
- Parking
- 1.05 per home
- Built-up area, all floors
- 3,47,502 sq ft
9,892 m²
3,002 m²
Floors built per unit of land: 2.50 m² of floors for each m² of land.
200 covered, 51 open
32,284 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 9 RERA projects of Embassy Group on the map
The company
- Registered as
- Embassy-Columbia Pacific ASL Pvt Ltd
- Type
- Company
- Company number
- U70109KA2021PTC146952
- PAN
- AAGCE4439A
- GSTIN
- 29AAGCE4439A1ZT
- Website
- sereneamarabycolumbiapacific.in
CIN or LLPIN, from the Registrar of Companies.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/309/PR/160223/005724 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · 27 Sep 2022
- Litigation on the landDeclared by the builder
- Litigation on the projectDeclared in the Q1 2026-27 update
- Water sourceBoreWell
Complaints to RERA about this project
- Not Registering the Agreement for Sale 12 Sep 2024 · Under Enquiry Authority Fullbench
Documents
229 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹21.5 cr | ₹15.1 cr |
| Q4 2025-26 | ₹23.9 cr | ₹18.5 cr |
| Q1 2026-27 | ₹19.8 cr | ₹14.1 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station21.61 kmReliable
- Nearest railway station5.58 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km21Caveat
- Nearest lake / water body (≥2 ha)0.83 kmCaveat
Hospitals
- Nearest hospital4.83 kmCaveat
Schools
- Schools in pincode 562110 (UDISE+ census)3Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km1Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)7.5 kmReliable
- Nearest sewage treatment plant8.33 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)6.64 kmCaveat
- Nearest commercial-airport runway6.64 kmReliable
- Distance to runway approach-path proxy0 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)1Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (13.20660, 77.62490), 2026-10-24. Each figure's source and caveat are in the full report.