by Sattva Resi Private Limited · 66 homes · 5.58 acres · 5 towers · Bengaluru South

Upcoming Under construction, due Sep 2027. 42% built with 71% of the time used. 38% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
42% built

Due 18 Sep 2027. 71% of the time from RERA approval to the deadline has passed.

Built42%
Time used71%
How much is sold?41 left
38% booked

25 of 66 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
12 homes per acre

Similar projects within 3 km: 67 per acre. 64% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?13 due so far
0% on time

Of its 22 RERA projects in Bengaluru Urban: 0 delivered on time, 3 late (after the date first promised), 10 past due with no completion filed, 9 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Apr 2024
  2. Approved by RERA24 Jul 2024
  3. Today24 Oct 2026

    71% of the time to the deadline has passed.

  4. If it slips like a typical project19 Jun 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2628%
Q4 2025-2632%
Q1 2026-2736%
Q2 2026-2742%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 217%
Block 353%
Block 419%
Block 562%
Block 676%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

25 booked41 leftQ2 2026-27

Still available: 41 × 4 BHK.

Booked, by type

4 BHK25 of 66

Booked, each quarter

Q3 2025-2623 of 66
Q4 2025-2625 of 66
Q1 2026-2726 of 66
Q2 2026-2725 of 66

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4 BHK
2,887 sq ft
268 m² carpet · sizes 2,798–3,822 sq ft (20 at this size)
264 m² land share · 8 m² balcony/terrace · 3 parking spaces
66 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 21 floor
Block 31 floor
Block 41 floor
Block 51 floor
Block 61 floor

Block 2: 9 homes, 13 m tall, 1 basement · Block 3: 12 homes, 13 m tall, 1 basement · Block 4: 15 homes, 13 m tall, 1 basement · Block 5: 12 homes, 13 m tall, 1 basement · Block 6: 18 homes, 13 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project12
Typical within 3 km (16)67
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project64%
Typical within 3 km (16)65%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
5.58 acres

22,566 m²

Ground covered by buildings
36% of the land

8,187 m²

Floor-area ratio
1.15

Floors built per unit of land: 1.15 m² of floors for each m² of land.

Parking
3.05 per home

193 covered, 8 open

Built-up area, all floors
3,39,558 sq ft

31,546 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 22 RERA projects of Salarpuria Sattva on the map

Complaints to RERA about its other projects

The company

Registered as
Sattva Resi Private Limited
Type
Company
Company number
U45309KA2022PTC160813

CIN or LLPIN, from the Registrar of Companies.

PAN
ABICS4269F
GSTIN
29ABICS4269F1ZX
Website
www.sattvagroup.com

Its other registrations on RERA Karnataka

10 registrations under this company
  • SATTVA AANGANE PRM/KA/RERA/1251/446/PR/180926/008944 · approved 18 Sep 2026
  • SATTVA SONGBIRD PH 2 PRM/KA/RERA/1251/310/PR/270326/008557 · approved 27 Mar 2026
  • SATTVA AARANYA PRM/KA/RERA/1251/310/PR/241225/008358 · approved 24 Dec 2025
  • Sattva Vasanta Cove PRM/KA/RERA/1250/303/PR/041225/008310 · approved 4 Dec 2025
  • Sattva Vasanta Skye PRM/KA/RERA/1250/303/PR/080525/007730 · approved 8 May 2025
  • Sattva SimpliCity PRM/KA/RERA/1251/310/PR/030325/007540 · approved 3 Mar 2025
  • Park Cubix Phase 2 PRM/KA/RERA/1250/303/PR/280225/007529 · approved 28 Feb 2025
  • Sattva Forest Ridge PRM/KA/RERA/1251/310/PR/241224/007315 · approved 24 Dec 2024
  • Sattva Lumina PRM/KA/RERA/1251/472/PR/060924/007009 · approved 6 Sep 2024
  • Sattva Songbird PRM/KA/RERA/1251/446/PR/060924/007008 · approved 6 Sep 2024

The land is owned together with others (a joint development), including M/s. BHAVANI ENTERPRISES, M/s. Bhavani Enterprises.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹95.4 crBuilding and development ₹144.2 crTotal ₹239.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹9.0 cr₹6.7 cr
Q4 2025-26₹15.9 cr₹11.1 cr
Q1 2026-27₹12.2 cr₹8.3 cr
Q2 2026-27₹6.9 cr₹5.1 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.13 kmReliable
  • Nearest railway station11.07 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)1.59 kmCaveat

Hospitals

  • Nearest hospital0.7 kmCaveat

Schools

  • Schools in pincode 560082 (UDISE+ census)71Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKaggalipura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.14 kmReliable
  • Nearest sewage treatment plant8.37 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)20.9 kmCaveat
  • Nearest commercial-airport runway45.28 kmReliable
  • Distance to runway approach-path proxy41.18 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.81755, 77.51546), 2026-10-24. Each figure's source and caveat are in the full report.