by Sattva Resi Private Limited · 407 homes · 4.00 acres · 3 towers · Bengaluru South

Upcoming Under construction, due Dec 2029. 18% built with 36% of the time used. 75% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
18% built

Due 31 Dec 2029. 36% of the time from RERA approval to the deadline has passed.

Built18%
Time used36%
How much is sold?103 left
75% booked

304 of 407 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
102 homes per acre

Similar projects within 3 km: 76 per acre. 77% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 1 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?13 due so far
0% on time

Of its 22 RERA projects in Bengaluru Urban: 0 delivered on time, 3 late (after the date first promised), 10 past due with no completion filed, 9 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA24 Dec 2024
  2. Work started1 Jan 2025
  3. Today24 Oct 2026

    36% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2610%
Q4 2025-2615%
Q1 2026-2715%
Q2 2026-2718%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

1 Wing 10%
1 Wing 21%
25%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

304 booked103 leftQ2 2026-27

Still available: 2 × 2.5 BHK, 47 × 3 BHK, 37 × 1 BHK, 17 × 2 BHK.

Booked, by type

2.5 BHK0 of 2
3 BHK191 of 238
1 BHK19 of 56
2 BHK94 of 111

Booked, each quarter

Q3 2025-26191 of 407
Q4 2025-26226 of 407
Q1 2026-27257 of 407
Q2 2026-27304 of 407

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,021 sq ft30 homes94.9 m²
  • 1,023 sq ft30 homes95.0 m²
  • 1,201 sq ft30 homes111.6 m²
  • 1,202 sq ft30 homes111.7 m²
  • and 118 homes in other sizes
Typically 40 m² land share · 10 m² balcony/terrace · 1 parking space
238 homes · 58% of the project
2 BHK
  • 776 sq ft56 homes72.1 m²
  • 775 sq ft55 homes72.0 m²
Typically 26 m² land share · 6 m² balcony/terrace · 1 parking space
111 homes · 27% of the project
1 BHK
  • 465 sq ft28 homes43.2 m²
  • 485 sq ft28 homes45.1 m²
Typically 16 m² land share · 3 m² balcony/terrace · 1 parking space
56 homes · 14% of the project
2.5 BHK
  • 1,003 sq ft1 home93.2 m²
  • 1,016 sq ft1 home94.4 m²
Typically 35 m² land share · 10 m² balcony/terrace · 1 parking space
2 homes · 0% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

1 Wing 130 floors
1 Wing 230 floors
228 floors

1 Wing 1: 120 homes, 96 m tall, 2 basements · 1 Wing 2: 120 homes, 96 m tall, 2 basements · 2: 167 homes, 90 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project102
Typical within 3 km (59)76
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project77%
Typical within 3 km (59)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.00 acres

16,187 m²

Ground covered by buildings
23% of the land

3,757 m²

Floor-area ratio
2.98

Floors built per unit of land: 2.98 m² of floors for each m² of land.

Parking
1.15 per home

382 covered, 86 open

Built-up area, all floors
7,41,450 sq ft

68,883 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 22 RERA projects of Salarpuria Sattva on the map

Complaints to RERA about its other projects

The company

Registered as
Sattva Resi Private Limited
Type
Company
Company number
U45309KA2022PTC160813

CIN or LLPIN, from the Registrar of Companies.

PAN
ABICS4269F
GSTIN
29ABICS4269F1ZX
Website
www.sattvagroup.com

Its other registrations on RERA Karnataka

10 registrations under this company
  • SATTVA AANGANE PRM/KA/RERA/1251/446/PR/180926/008944 · approved 18 Sep 2026
  • SATTVA SONGBIRD PH 2 PRM/KA/RERA/1251/310/PR/270326/008557 · approved 27 Mar 2026
  • SATTVA AARANYA PRM/KA/RERA/1251/310/PR/241225/008358 · approved 24 Dec 2025
  • Sattva Vasanta Cove PRM/KA/RERA/1250/303/PR/041225/008310 · approved 4 Dec 2025
  • Sattva Vasanta Skye PRM/KA/RERA/1250/303/PR/080525/007730 · approved 8 May 2025
  • Sattva SimpliCity PRM/KA/RERA/1251/310/PR/030325/007540 · approved 3 Mar 2025
  • Park Cubix Phase 2 PRM/KA/RERA/1250/303/PR/280225/007529 · approved 28 Feb 2025
  • Sattva Lumina PRM/KA/RERA/1251/472/PR/060924/007009 · approved 6 Sep 2024
  • Sattva Songbird PRM/KA/RERA/1251/446/PR/060924/007008 · approved 6 Sep 2024
  • SATTVA SPRINGS PRM/KA/RERA/1251/310/PR/240724/006948 · approved 24 Jul 2024

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹158.9 crBuilding and development ₹203.6 crTotal ₹362.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹10.5 cr₹7.3 cr
Q4 2025-26₹15.5 cr₹9.7 cr
Q1 2026-27₹14.1 cr₹11.2 cr
Q2 2026-27₹24.6 cr₹17.1 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.14 kmReliable
  • Nearest railway station9.54 kmReliable
  • Bus stops within 500 m4Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.96 kmCaveat

Hospitals

  • Nearest hospital2.21 kmCaveat

Schools

  • Schools in pincode 560062 (UDISE+ census)66Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km1Caveat
  • Schools with library + playground + ICT lab (1 km)0Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionThalaghattapura PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)26 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well8.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.44 kmReliable
  • Nearest sewage treatment plant3.99 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)14.14 kmCaveat
  • Nearest commercial-airport runway38.88 kmReliable
  • Distance to runway approach-path proxy35.28 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.86279, 77.55760), 2026-10-24. Each figure's source and caveat are in the full report.