RERA project · Residential/Group Housing
Sattva Forest Ridge
by Sattva Resi Private Limited · 407 homes · 4.00 acres · 3 towers · Bengaluru South
Upcoming Under construction, due Dec 2029. 18% built with 36% of the time used. 75% of homes booked.
At a glance
Due 31 Dec 2029. 36% of the time from RERA approval to the deadline has passed.
304 of 407 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 76 per acre. 77% of the land is left open.
Complaints to RERA about this project. 1 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 22 RERA projects in Bengaluru Urban: 0 delivered on time, 3 late (after the date first promised), 10 past due with no completion filed, 9 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA24 Dec 2024
- Work started1 Jan 2025
- Today24 Oct 2026
36% of the time to the deadline has passed.
- Deadline31 Dec 2029
The date it must be complete by.
- If it slips like a typical project2 Oct 2030
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 2 × 2.5 BHK, 47 × 3 BHK, 37 × 1 BHK, 17 × 2 BHK.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
- 1,021 sq ft30 homes94.9 m²
- 1,023 sq ft30 homes95.0 m²
- 1,201 sq ft30 homes111.6 m²
- 1,202 sq ft30 homes111.7 m²
- and 118 homes in other sizes
- 776 sq ft56 homes72.1 m²
- 775 sq ft55 homes72.0 m²
- 465 sq ft28 homes43.2 m²
- 485 sq ft28 homes45.1 m²
- 1,003 sq ft1 home93.2 m²
- 1,016 sq ft1 home94.4 m²
Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
1 Wing 1: 120 homes, 96 m tall, 2 basements · 1 Wing 2: 120 homes, 96 m tall, 2 basements · 2: 167 homes, 90 m tall, 2 basements
Amenities
- Electricity 68,969 m²
- CCTV Surveillance 9,834 m²
- Club House 1,049 m²
- Community Hall 153 m²
- Outdoor Sports facility 9,000 m²
- Indoor Sports facility 138 m²
- Swimming Pool 200 m²
- Gym 100 m²
- Parks 1,618 m²
- Power Backup 1 m²
- Piped Gas 1 m²
- Water and Sanitation 68,969 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 4.00 acres
- Ground covered by buildings
- 23% of the land
- Floor-area ratio
- 2.98
- Parking
- 1.15 per home
- Built-up area, all floors
- 7,41,450 sq ft
16,187 m²
3,757 m²
Floors built per unit of land: 2.98 m² of floors for each m² of land.
382 covered, 86 open
68,883 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 22 RERA projects of Salarpuria Sattva on the map
Complaints to RERA about its other projects
- Sattva Lumina 1 complaint
The company
- Registered as
- Sattva Resi Private Limited
- Type
- Company
- Company number
- U45309KA2022PTC160813
- PAN
- ABICS4269F
- GSTIN
- 29ABICS4269F1ZX
- Website
- www.sattvagroup.com
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
10 registrations under this company
- SATTVA AANGANE PRM/KA/RERA/1251/446/PR/180926/008944 · approved 18 Sep 2026
- SATTVA SONGBIRD PH 2 PRM/KA/RERA/1251/310/PR/270326/008557 · approved 27 Mar 2026
- SATTVA AARANYA PRM/KA/RERA/1251/310/PR/241225/008358 · approved 24 Dec 2025
- Sattva Vasanta Cove PRM/KA/RERA/1250/303/PR/041225/008310 · approved 4 Dec 2025
- Sattva Vasanta Skye PRM/KA/RERA/1250/303/PR/080525/007730 · approved 8 May 2025
- Sattva SimpliCity PRM/KA/RERA/1251/310/PR/030325/007540 · approved 3 Mar 2025
- Park Cubix Phase 2 PRM/KA/RERA/1250/303/PR/280225/007529 · approved 28 Feb 2025
- Sattva Lumina PRM/KA/RERA/1251/472/PR/060924/007009 · approved 6 Sep 2024
- Sattva Songbird PRM/KA/RERA/1251/446/PR/060924/007008 · approved 6 Sep 2024
- SATTVA SPRINGS PRM/KA/RERA/1251/310/PR/240724/006948 · approved 24 Jul 2024
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/241224/007315 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/Adl.Dir/JDSOUTH/0059/23-24 · 13 Dec 2024
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBWSSB
Complaints to RERA about this project
- Refund of advance booking amount paid 17 Jun 2025 · Disposed Authority Bench5
Documents
140 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹10.5 cr | ₹7.3 cr |
| Q4 2025-26 | ₹15.5 cr | ₹9.7 cr |
| Q1 2026-27 | ₹14.1 cr | ₹11.2 cr |
| Q2 2026-27 | ₹24.6 cr | ₹17.1 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station2.14 kmReliable
- Nearest railway station9.54 kmReliable
- Bus stops within 500 m4Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km2Caveat
- Nearest lake / water body (≥2 ha)0.96 kmCaveat
Hospitals
- Nearest hospital2.21 kmCaveat
Schools
- Schools in pincode 560062 (UDISE+ census)66Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km1Caveat
- Schools with library + playground + ICT lab (1 km)0Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionThalaghattapura PSReliable
Air quality
- PM2.5, recent 24 h avg (nearest CPCB station)26 µg/m³Caveat
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- Groundwater depth at nearest CGWB well8.2 m below groundCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)5.44 kmReliable
- Nearest sewage treatment plant3.99 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)14.14 kmCaveat
- Nearest commercial-airport runway38.88 kmReliable
- Distance to runway approach-path proxy35.28 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.86279, 77.55760), 2026-10-24. Each figure's source and caveat are in the full report.