Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Saranya Swarovski

by Saranya Builders · 129 homes · 1.61 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Dec 2027. 34% built with 67% of the time used. 74% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
34% built

Due 31 Dec 2027. 67% of the time from RERA approval to the deadline has passed.

Built34%
Time used67%
How much is sold?33 left
74% booked

96 of 129 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
80 homes per acre

Similar projects within 3 km: 80 per acre. 42% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Apr 2024
  2. Approved by RERA21 May 2024
  3. Today24 Oct 2026

    67% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2629%
Q4 2025-2632%
Q1 2026-2738%
Q2 2026-2734%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A34%
B34%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

96 booked33 leftQ2 2026-27

Still available: 9 × 2 BHK, 24 × 3 BHK.

Booked, by type

2 BHK23 of 32
3 BHK73 of 97

Booked, each quarter

Q3 2025-2678 of 129
Q4 2025-2684 of 129
Q1 2026-2790 of 129
Q2 2026-2796 of 129

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 978 sq ft18 homes90.9 m²
  • 980 sq ft14 homes91.0 m²
  • 958 sq ft12 homes89.0 m²
  • 947 sq ft7 homes88.0 m²
  • and 46 homes in other sizes
Typically 55 m² land share · 21 m² balcony/terrace · 1 parking space
97 homes · 75% of the project
2 BHK
  • 791 sq ft18 homes73.5 m²
  • 797 sq ft12 homes74.0 m²
  • 936 sq ft2 homes87.0 m²
Typically 47 m² land share · 20 m² balcony/terrace · 1 parking space
32 homes · 25% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A8 floors
B8 floors

A: 57 homes, 27 m tall, 1 basement · B: 72 homes, 27 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project80
Typical within 3 km (90)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project42%
Typical within 3 km (89)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.61 acres

6,515 m²

Ground covered by buildings
58% of the land

3,769 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.27 per home

152 covered, 12 open

Built-up area, all floors
2,06,215 sq ft

19,158 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of Saranya Builders on the map

The company

Registered as
Saranya Builders
Type
Partnership Firm
PAN
ACAFS3866Q
GSTIN
29ACAFS3866Q2Z8

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹8.6 crBuilding and development ₹106.0 crTotal ₹114.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹33.2 cr₹33.2 cr
Q4 2025-26₹44.8 cr₹44.8 cr
Q1 2026-27₹50.1 cr₹50.1 cr
Q2 2026-27₹56.8 cr₹56.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.79 kmReliable
  • Nearest railway station1.93 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)1.44 kmCaveat

Hospitals

  • Nearest hospital0.94 kmCaveat

Schools

  • Schools in pincode 560067 (UDISE+ census)57Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km3Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.23 kmReliable
  • Nearest sewage treatment plant3.05 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.42 kmCaveat
  • Nearest commercial-airport runway19.97 kmReliable
  • Distance to runway approach-path proxy18.8 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.01017, 77.75042), 2026-10-24. Each figure's source and caveat are in the full report.