Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

SARANG BY SUMADHURA PHASE-II

by SUMADHURA INFRACON PRIVATE LIMITED · 138 homes · 1.30 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Jun 2027. 80% built with 72% of the time used. 64% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
80% built

Due 30 Jun 2027. 72% of the time from RERA approval to the deadline has passed.

Built80%
Time used72%
How much is sold?50 left
64% booked

88 of 138 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
106 homes per acre

Similar projects within 3 km: 80 per acre. 88% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 4 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?12 due so far
17% on time

Of its 27 RERA projects in Bengaluru Urban: 2 delivered on time, 10 late (after the date first promised), 15 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jan 2025
  2. Approved by RERA5 Feb 2025
  3. Today24 Oct 2026

    72% of the time to the deadline has passed.

  4. If it slips like a typical project31 Mar 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2652%
Q4 2025-2652%
Q1 2026-2760%
Q2 2026-2780%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

88 booked50 leftQ2 2026-27

Still available: 17 × 3 BHK CLASSIC, 18 × 3 BHK SMART, 15 × 4 BHK SMART.

Booked, by type

3 BHK CLASSIC29 of 46
3 BHK SMART30 of 48
4 BHK SMART29 of 44

Booked, each quarter

Q3 2025-2676 of 138
Q4 2025-2682 of 138
Q1 2026-2784 of 138
Q2 2026-2788 of 138

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK SMART
1,094 sq ft
102 m² carpet · sizes 1,094–1,108 sq ft (23 at this size)
40 m² land share · 20 m² balcony/terrace · 1 parking space
48 homes · 35% of the project
3 BHK CLASSIC
1,207 sq ft
112 m² carpet · sizes 1,207–1,277 sq ft (23 at this size)
45 m² land share · 23 m² balcony/terrace · 2 parking spaces
46 homes · 33% of the project
4 BHK SMART
1,403 sq ft
130 m² carpet
50 m² land share · 25 m² balcony/terrace · 2 parking spaces
44 homes · 32% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing-C22 floors

Wing-C: 138 homes, 69 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project106
Typical within 3 km (94)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project88%
Typical within 3 km (94)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.30 acres

5,281 m²

Ground covered by buildings
20% of the land

1,035 m²

Floor-area ratio
3.34

Floors built per unit of land: 3.34 m² of floors for each m² of land.

Parking
1.65 per home

228 covered, 0 open

Built-up area, all floors
2,36,591 sq ft

21,980 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 27 RERA projects of Sumadhura on the map

Complaints to RERA about its other projects

The company

Registered as
SUMADHURA INFRACON PRIVATE LIMITED
Type
Company
Company number
U45200KA2012PTC062071

CIN or LLPIN, from the Registrar of Companies.

PAN
AAQCS9641A
GSTIN
29AAQCS9641A1ZZ

Its other registrations on RERA Karnataka

20 registrations under this company
  • Sumadhura Belfort PRM/KA/RERA/1250/304/PR/230926/008960 · approved 23 Sep 2026
  • FOLIUM BY SUMADHURA PHASE-IV PRM/KA/RERA/1251/446/PR/050126/008382 · approved 5 Jan 2026
  • SUMADHURA SOLACE PHASE-II PRM/KA/RERA/1251/446/PR/111225/008333 · approved 11 Dec 2025
  • SUMADHURA EDITION PHASE-II PRM/KA/RERA/1251/446/PR/111225/008332 · approved 11 Dec 2025
  • SUMADHURA SOLACE PHASE-I PRM/KA/RERA/1251/446/PR/111225/008330 · approved 11 Dec 2025
  • SUMADHURA EDITION PHASE-I PRM/KA/RERA/1251/446/PR/111225/008328 · approved 11 Dec 2025
  • SUMADHURA PRAMODA PRM/KA/RERA/1251/310/PR/250325/007625 · approved 25 Mar 2025
  • SUMADHURA CAPITOL RESIDENCES PRM/KA/RERA/1251/446/PR/051024/007125 · approved 5 Oct 2024
  • SUMADHURA THRIVE PRM/KA/RERA/1251/446/PR/051024/007124 · approved 5 Oct 2024
  • HIVE BY SUMADHURA PRM/KA/RERA/1251/446/PR/051024/007123 · approved 5 Oct 2024
  • FOLIUM BY SUMADHURA PHASE-III PRM/KA/RERA/1251/446/PR/141223/006468 · approved 14 Dec 2023
  • SARANG BY SUMADHURA PHASE-I PRM/KA/RERA/1251/446/PR/180723/006075 · approved 18 Jul 2023
  • FOLIUM BY SUMADHURA PHASE-II PRM/KA/RERA/1251/446/PR/250423/005893 · approved 25 Apr 2023
  • FOLIUM BY SUMADHURA PHASE-I PRM/KA/RERA/1251/446/PR/280222/004738 · approved 28 Feb 2022
  • SUMADHURA SUSHANTHAM PHASE II PRM/KA/RERA/1251/309/PR/200205/003253 · approved 5 Feb 2020
  • SUMADHURA SUSHANTHAM PHASE I PRM/KA/RERA/1251/309/PR/200103/003118 · approved 3 Jan 2020
  • SUMADHURA SOHAM PHASE II PRM/KA/RERA/1251/446/PR/190423/002529 · approved 23 Apr 2019
  • SUMADHURA NANDANAM PRM/KA/RERA/1251/446/PR/180507/001667 · approved 7 May 2018
  • SUMADHURA EDEN GARDEN PRM/KA/RERA/1251/446/PR/180328/002632 · approved 28 Mar 2018
  • SUMADHURA SOHAM PHASE-I PRM/KA/RERA/1251/446/PR/171123/000704 · approved 23 Nov 2017

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹26.4 crBuilding and development ₹138.8 crTotal ₹165.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹17.1 cr₹11.5 cr
Q4 2025-26₹24.0 cr₹16.9 cr
Q1 2026-27₹18.7 cr₹13.0 cr
Q2 2026-27₹28.3 cr₹18.7 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.87 kmReliable
  • Nearest railway station4 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)1.02 kmCaveat

Hospitals

  • Nearest hospital1.19 kmCaveat

Schools

  • Schools in pincode 560067 (UDISE+ census)57Caveat
  • Median pupil-teacher ratio, schools within 1 km25.5 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.23 kmReliable
  • Nearest sewage treatment plant1.89 kmCaveat
  • Industrial zones within 1 km5Caveat
  • Nearest airfield runway (any, incl. military)7.91 kmCaveat
  • Nearest commercial-airport runway18.07 kmReliable
  • Distance to runway approach-path proxy17.15 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.02650, 77.74092), 2026-10-24. Each figure's source and caveat are in the full report.