by SUMADHURA INFRACON PRIVATE LIMITED · 272 homes · 3.35 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Dec 2026. 100% built with 95% of the time used. 68% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
100% built

Due 31 Dec 2026. 95% of the time from RERA approval to the deadline has passed.

Built100%
Time used95%
How much is sold?88 left
68% booked

184 of 272 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
81 homes per acre

Similar projects within 3 km: 80 per acre. 77% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 4 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?12 due so far
17% on time

Of its 27 RERA projects in Bengaluru Urban: 2 delivered on time, 10 late (after the date first promised), 15 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jul 2023
  2. Approved by RERA18 Jul 2023
  3. Today24 Oct 2026

    95% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2676%
Q4 2025-2690%
Q1 2026-2791%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Wing-A100%
Wing-B100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

184 booked88 leftQ2 2026-27

Still available: 2 × 2 BHK, 52 × 3 BHK, 34 × 4 BHK.

Booked, by type

2 BHK0 of 2
3 BHK126 of 178
4 BHK58 of 92

Booked, each quarter

Q3 2025-26173 of 272
Q4 2025-26179 of 272
Q1 2026-27181 of 272
Q2 2026-27184 of 272

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,023 sq ft
95 m² carpet · sizes 1,023–1,193 sq ft (86 at this size)
43 m² land share · 22 m² balcony/terrace · 1 parking space
178 homes · 65% of the project
4 BHK
1,340 sq ft
124 m² carpet · sizes 1,340–1,640 sq ft (46 at this size)
55 m² land share · 26 m² balcony/terrace · 1 parking space
92 homes · 34% of the project
2 BHK
770 sq ft
72 m² carpet
28 m² land share · 13 m² balcony/terrace · 1 parking space
2 homes · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Wing-A22 floors
Wing-B22 floors

Wing-A: 134 homes, 69 m tall, 2 basements · Wing-B: 138 homes, 69 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project81
Typical within 3 km (75)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project77%
Typical within 3 km (74)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.35 acres

13,537 m²

Ground covered by buildings
23% of the land

3,058 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.32 per home

360 covered, 0 open

Built-up area, all floors
8,14,386 sq ft

75,659 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 27 RERA projects of Sumadhura on the map

Complaints to RERA about its other projects

The company

Registered as
SUMADHURA INFRACON PRIVATE LIMITED
Type
Company
Company number
U45200KA2012PTC062071

CIN or LLPIN, from the Registrar of Companies.

PAN
AAQCS9641A
GSTIN
29AAQCS9641A1ZZ

Its other registrations on RERA Karnataka

20 registrations under this company
  • Sumadhura Belfort PRM/KA/RERA/1250/304/PR/230926/008960 · approved 23 Sep 2026
  • FOLIUM BY SUMADHURA PHASE-IV PRM/KA/RERA/1251/446/PR/050126/008382 · approved 5 Jan 2026
  • SUMADHURA SOLACE PHASE-II PRM/KA/RERA/1251/446/PR/111225/008333 · approved 11 Dec 2025
  • SUMADHURA EDITION PHASE-II PRM/KA/RERA/1251/446/PR/111225/008332 · approved 11 Dec 2025
  • SUMADHURA SOLACE PHASE-I PRM/KA/RERA/1251/446/PR/111225/008330 · approved 11 Dec 2025
  • SUMADHURA EDITION PHASE-I PRM/KA/RERA/1251/446/PR/111225/008328 · approved 11 Dec 2025
  • SUMADHURA PRAMODA PRM/KA/RERA/1251/310/PR/250325/007625 · approved 25 Mar 2025
  • SARANG BY SUMADHURA PHASE-II PRM/KA/RERA/1251/446/PR/050225/007481 · approved 5 Feb 2025
  • SUMADHURA CAPITOL RESIDENCES PRM/KA/RERA/1251/446/PR/051024/007125 · approved 5 Oct 2024
  • SUMADHURA THRIVE PRM/KA/RERA/1251/446/PR/051024/007124 · approved 5 Oct 2024
  • HIVE BY SUMADHURA PRM/KA/RERA/1251/446/PR/051024/007123 · approved 5 Oct 2024
  • FOLIUM BY SUMADHURA PHASE-III PRM/KA/RERA/1251/446/PR/141223/006468 · approved 14 Dec 2023
  • FOLIUM BY SUMADHURA PHASE-II PRM/KA/RERA/1251/446/PR/250423/005893 · approved 25 Apr 2023
  • FOLIUM BY SUMADHURA PHASE-I PRM/KA/RERA/1251/446/PR/280222/004738 · approved 28 Feb 2022
  • SUMADHURA SUSHANTHAM PHASE II PRM/KA/RERA/1251/309/PR/200205/003253 · approved 5 Feb 2020
  • SUMADHURA SUSHANTHAM PHASE I PRM/KA/RERA/1251/309/PR/200103/003118 · approved 3 Jan 2020
  • SUMADHURA SOHAM PHASE II PRM/KA/RERA/1251/446/PR/190423/002529 · approved 23 Apr 2019
  • SUMADHURA NANDANAM PRM/KA/RERA/1251/446/PR/180507/001667 · approved 7 May 2018
  • SUMADHURA EDEN GARDEN PRM/KA/RERA/1251/446/PR/180328/002632 · approved 28 Mar 2018
  • SUMADHURA SOHAM PHASE-I PRM/KA/RERA/1251/446/PR/171123/000704 · approved 23 Nov 2017

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹18.2 crBuilding and development ₹219.9 crTotal ₹238.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹10.4 cr₹7.5 cr
Q4 2025-26₹9.8 cr₹6.8 cr
Q1 2026-27₹11.5 cr₹8.0 cr
Q2 2026-27₹8.7 cr₹4.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.79 kmReliable
  • Nearest railway station3.8 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km7Caveat
  • Nearest lake / water body (≥2 ha)0.67 kmCaveat

Hospitals

  • Nearest hospital0.86 kmCaveat

Schools

  • Schools in pincode 560067 (UDISE+ census)57Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.26 kmReliable
  • Nearest sewage treatment plant0.9 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)6.95 kmCaveat
  • Nearest commercial-airport runway17.87 kmReliable
  • Distance to runway approach-path proxy16.65 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.02959, 77.75216), 2026-10-24. Each figure's source and caveat are in the full report.